NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
05
Loosen the screws as illustrated and remove
the gear motor cover.
Loosen the screws as illustrated and remove the gear motor assembly.
The following are located inside the compartment protected by
the casing:
- Electric motor (A) with gears (B) and (C) for transmission and
timing of the brewing unit.
- Microswitch (F) detecting brewing unit home and work posi-
tions.
- Remove the large gear (B)
- Remove the gear (C) that meshes with the motor transmission
shaft
- Remove the motor (A), complete with transmission shaft (E)
When re-assembling the
gear (B), make sure that
the arrow on the gear is
in the same position as
shown in the photo.
When replacing the motor and the
transmission shaft, make sure the
guide runners (L) are in the right
position. Grease the shaft thoroughly
and evenly.
L
B
A
D
E
C
B
7.10. Flow meter
Remove the boiler support lift the flow
meter upwards and disconnect the electrical
and water circuit connections.
Содержание HD 8930
Страница 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Страница 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...