NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
03
7.4. Coffee grinder motor
7.5. Doser hatch, coil and microswitch
7.6. Doser hopper
Remove the balls as illustrated, the
springs underneath and lift up the
grinding support.
Release the catch as illus
-
trated and lift the coil.
Remove the cabling
from the cable grips as
illustrated.
Lift the hopper and release it from the
rubber hooks as illustrated.
Remove the electrical connections
and slide out the microswitch.
Lift the doser hatch using a
lever in the pin and slide it
out.
Remove the three grind
-
ing dampers and the felt
ring.
Release the motor support by
lifting the catches as illustrat
-
ed and replace the motor.
Содержание HD 8930
Страница 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Страница 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Страница 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...