DBC1210 

12 x 10A HF Ballast Controller  

Installation Manual 

 

 

 

 

contents 

 

Warning……………………………………………..

 2 

Hardware Controls…………………………….…..

  7 

Features……………………………………………..

 2 

Troubleshooting…………………………………….

 8 

Important Safeguards……………………………..

  2 

Specification……………………………….……….

 8 

Internal View………………………………………..

 3   

Mounting…………………………………….………

 4   

Supply & Load Cable Connections.

………………

 5   

Connecting Serial Control Cables………………..

 6   

Supplied by:

Содержание dynalite DBC1210

Страница 1: ...ler Installation Manual contents Warning 2 Hardware Controls 7 Features 2 Troubleshooting 8 Important Safeguards 2 Specification 8 Internal View 3 Mounting 4 Supply Load Cable Connections 5 Connecting Serial Control Cables 6 Supplied by ...

Страница 2: ...s Check Connections Treat this device as a switchboard that has been shipped Tighten all load carrying screw connections as vibrations from transport can cause MCB and terminal block screws to become loose Power Sources This device should only be operated from the type of supply specified on the front panel This device must be earthed Output Circuits The load on a circuit should not exceed the spe...

Страница 3: ...fy DBC1210 Dynet Data Cable Terminal Earth Link Data Entry Cable Neutral Link Network Socket Supply or Load Cable Entry Manual Circuit Breakers Service LED service switch 3 phase Supply terminals Load Cable Entry Load Cable Entry Power switch output Dimmer control signal 1 10V DSI or DALI Channel over ride switch Emergency lighting supply ...

Страница 4: ...ttached to the inside of the enclosure The brackets are designed to accommodate 4 fixing screws up to 8mm diameter The DBC1210 can be fixed to the wall without opening the cabinet or removing covers Make sure no dust or other debris enters the device during installation Do not leave the front cover off for any length of time Excessive dust and dirt can degrade the cooling of the internal component...

Страница 5: ...binet Never use a common neutral at a remote location Load Control Cables Load Control cables can be terminated on the 4 way and 2 way terminal blocks located directly next to the Load terminals These terminals are the outputs for 0 to 10V DSI or DALI if selected by software setup Note that most types of 1 10V HF fluorescent ballast control wiring is polarity conscious DSI ballasts are not polarit...

Страница 6: ... for GND one pair paralleled for VE and one pair used for DATA and DATA Recommended Cable Colour Coding Green White pair Paralleled for GND Orange White pair Paralleled for VE Blue White pair Blue for DATA White for DATA Brown White pair Spare or for Join The colour coding scheme used is not critical as long as the same scheme is used throughout the installation Serial Cable Connecting Method The ...

Страница 7: ...ce LED The Service LED has 3 signalling modes which are useful for troubleshooting Blinking slowly 1Hz Normal Operation Blinking fast 4Hz Network Activity Detected On Fault Service Switch The Service Switch has three functions 1 push Transmit Network ID 3 pushes All Channels 100 Push hold for 4 sec Reboot Top Set This control is not used in ballast controllers Accessory Module Socket Accepts a plu...

Страница 8: ...r factor loads and transformer losses Check that the breaker terminals are tight Fluorescent lights won t dim Wrong type of ballast or ballast incorrectly wired Control cable from dimmer to ballasts not installed Check ballast type Check actual wiring against ballast manufacturer s diagram Check 1 10V DSI DALI cable and settings specification Supply 230V 14 50 60Hz 3 Phase Y at 40A per phase Line ...