PFT LOTUS XL light 400 V Overview – Operation – Spare Parts Lists
Transport, packaging and storage
20
2017-01-16
15.2 Transport checklist
Inspect the goods for damage and missing parts immediately after
delivery.
If external transportation damage can be seen, proceed as follows:
Do not accept the delivery, or accept it only under reservations.
Note the damage on the transportation documents or the delivery
note of the carrier.
NOTE!
Always submit a claim for the defects as soon
as they are detected. Damage claims can only be
accepted within the applicable deadlines for
submission.
15.3 Transport in individual parts
Fig. 21: Transport
To make transport easier, disassemble the machine
into its individual components:
1. Gear motor with motor swivel flange
2. Middle body with dosing zone
3. Mixing shaft / dosing shaft with coupling
4. Mixing tube with outlet
15.4 Transportation of machines already operating
Carry out the following steps before transporting:
1. First unplug the main power cable.
2. Remove the water supply lines.
3. Begin transport.