background image

8

3.5. Connecting The Vacuum Side

As standard, the pump is equipped with an inlet opening poin-
ting vertically up for fitting a vacuum flange (DN 50 ISO-KF) or
a corrugated hose. Upon delivery, this opening has been
blanked off with a blank flange including a centering ring, for
the purpose of the protecting the inside of the pump.

The vacuum side of the pump must not be

flanged directly to the vacuum chamber; it must
be flanged via a bellows.
Never suspend the pump on the vacuum flange,
always set up on the standing surface or screw
down.

Loosen the screws from the claws and disassemble the
blank flange.

Fit the desired component part directly to the inlet opening
using claws; note the centering ring.

Shifting the inlet opening

Depending on the installation situation, the inlet opening may
be shifted to the side or the bottom.

During assembly of component parts do not lay

the pump on the side or the back

Disassemble the blank flange (flange cover) at the desired
inlet opening.

CAUTION

CAUTION

Filling In The Lubricant

Fill only when the pump is in the horizontal posi-

tion. Do not fill when the pump is running and
not in evacuated condition.

Unscrew both lubricant filler screws 31, taking care with

the sealing.

Slowly fill in 24 ml of the accompanying lubricant into each
lubricant reservoir.

Screw back in lubricant filler screws 31 with the sealing.

During operations or at pump still stand check the
lubricant level on both sight glasses; the permissible level
is shown in the illustration.

Switch off pump if lubricant is to be replenished.

In non-stop operations check the lubricant monthly, on
both sight glasses 9 after each switch-on.

CAUTION

3.4. Filling In And Checking The

Lubricant

Before first-time starting ensure that both lubri-

cant reservoirs have been filled with each 2244  m

mll

of Lubricant F3.
The delivery consignment for the standard
pump contains suffient lubricant (50 ml) for one
filling.

If ‘’F3’’ is heated above 300°C, toxic vapours
which can harm the respiratory tract are
emitted. Do not allow ‘’F3’’ to come into contact
with tobacco products (danger of poisoning
when ignited). The precautions necessary in
the handling of chemicals must be observed.

WARNING

CAUTION

5

ml m

l

4

3

2

1

V   10 ml

max.

min.

31
32

9

24 ml F3

Filling In And Checking The Lubricant

9  Sight glass (of lubricating pump)

31 Lubricant filler screw
32 Lubricant drain screw

Содержание OnTool Booster 150

Страница 1: ...Translation of the original instructions Operating Instructions EN PU 0058 BEN 1 OnTool BoosterTM 150 Side Channel Pump with TCP 2000...

Страница 2: ...c Drive Unit TCP 2000 11 3 9 Using Sealing Gas 12 3 10 Pumping Of Vapors 13 3 11 Pumping Of Light Or Heavy Gases 13 4 Operations 14 4 1 Before Switching On The Pump 14 4 2 Switching The Pump ON 14 4 2...

Страница 3: ...between the pump and the TCP 2000 during operations When the vacuum flange is open disconnect the voltage supply to the TCP 2000 When working on the pump the vacuum flange should only be opened once t...

Страница 4: ...TE Danger of burns from touching hot parts WARNING Danger of an electric shock WARNING Danger of injury from rotating parts WARNING Danger of personal injury WARNING 1 2 Pictogram Definitions Danger o...

Страница 5: ...ax permissible intake pressure for continous operation 1000 mbar for N2 and air Max permissible vacuum chamber volume for loadlock applications 1 m 3 Improper Use The following are regarded as imprope...

Страница 6: ...zzles for the cooling water monitor and the cooling water connection input output including sealing rings Reducing nipple for the cooling water monitor Cooling water monitor Blank flange DN 50 ISO KF...

Страница 7: ...suitable transport straps or screw an eye bolt into the transport bores T and lift the pump with lifting bar Ensure even distribution of weight when lifting Danger of tilting WARNING WARNING 3 3 Sett...

Страница 8: ...ot fill when the pump is running and not in evacuated condition Unscrew both lubricant filler screws 31 taking care with the sealing Slowly fill in 24 ml of the accompanying lubricant into each lubric...

Страница 9: ...nclean components prolong the pumping time Fit a vacuum safety valve Accessory in the vacuum line This prevents the vacuum chamber being ventilated via the backing pump PLEASENOTE Cover and bolt down...

Страница 10: ...deposits collecting in the pump the cooling water must be filtered Minimum cooling water requirements Mechanically clean optically clear no turbidity no sediment chemically neutral Oxygen content max...

Страница 11: ...s a danger of an electric shock from touching the contacts For further details please refer to Operating Instructions PU 0056 BN for the Electronic Drive Unit TCP 2000 WARNING CAUTION U V W 95080402 0...

Страница 12: ...ugh between the suction chamber and the bearing chamber on the exhaust side This effects the following protection of the lubricant against contamination protection of the bearing when pumping vapors a...

Страница 13: ...the case of lighter gases the gas ballast operates as a carrier gas which promotes pumping of the process medium If gases other than air or nitrogen are used for the gas ballast please discuss such pl...

Страница 14: ...change of lubricant the contacts for monitoring the lubricating pump can open as a result of degassification In such cases as for other malfunctions the electronic drive unit switches off the pump PLE...

Страница 15: ...rocess has been completed allow the pump to continue running for about 30 minu tes with open gas ballast valve for operating fluid regeneration purposes CAUTION 4 4 Switching The Pump OFF Details rega...

Страница 16: ...ve unit defect Check ventilator function Cooling water monitor defective or not connected Check cooling water monitor The pump does not attain the final Dirty pump In serious cases inform Pfeiffer Vac...

Страница 17: ...ess related toxic gases and vapours can escape from the lubricant which may become comtani mated with harmful substances radioactive chemical etc Please request safety instruction data sheets for lubr...

Страница 18: ...position Do not fill when the pump is running and not in evacuated condition Unscrew both lubricant filler screws 31 taking care with the sealing Slowly fill in 24 ml of the accompanying lubricant int...

Страница 19: ...vely or radioactively cannot be accepted as a matter of principle Fill out the service request and the declaration on contamination Download the forms Service Request and Declaration on Contamination...

Страница 20: ...ant F3 Amount of lubricant for the lubricant reservoirs ml each 24 Cooling water consumption with water at 15 C l min 2 Cooling water temperature C 15 30 Permissible ambient temperature C 12 40 Weight...

Страница 21: ...Elbow union with orifice G 1 8 PR 003 578 U orifice 0 2 mm Electronic drive and control unit TCP 2000 PR C01 000 Control panel 1 phase Electronic drive and control unit TCP 2000 PR C01 001 Control pan...

Страница 22: ...22...

Страница 23: ...nsible for compiling the technical documentation is Mr Sebastian Oberbeck Pfeiffer Vacuum GmbH Berliner Stra e 43 35614 A lar OnTool BoosterTM 150 Guidelines harmonised standards and national standard...

Страница 24: ...e the only supplier of vacuum technology that provides a complete product portfolio Benefit from our know how and our portfolio of training opportunities We can support you with your plant layout and...

Отзывы: