16 Technical data and dimensions
16.1 General
Basis for the technical data of Pfeiffer Vacuum spiral vacuum pumps:
● Specifications according to PNEUROP committee PN5
● ISO 21360-1 2016: “Vacuum technology - Standard methods for measuring vacuum-pump per-
formance - Part 1: General description”
● Integral leakage rate with 100 % helium concentration, 10 s measurement duration
mbar
bar
Pa
hPa
kPa
Torr | mm Hg
mbar
1
1 · 10
-3
100
1
0.1
0.75
bar
1000
1
1 · 10
5
1000
100
750
Pa
0.01
1 · 10
-5
1
0.01
1 · 10
-3
7.5 · 10
-3
hPa
1
1 · 10
-3
100
1
0.1
0.75
kPa
10
0.01
1000
10
1
7.5
Torr | mm Hg
1.33
1.33 · 10
-3
133.32
1.33
0.133
1
1 Pa = 1 N/m
2
Tbl. 27:
Conversion table: Pressure units
mbar l/s
Pa m
3
/s
sccm
Torr l/s
atm cm
3
/s
mbar l/s
1
0.1
59.2
0.75
0.987
Pa m
3
/s
10
1
592
7.5
9.87
sccm
1.69 · 10
-2
1.69 · 10
-3
1
1.27 · 10
-2
1.67 · 10
-2
Torr l/s
1.33
0.133
78.9
1
1.32
atm cm
3
/s
1.01
0.101
59.8
0.76
1
Tbl. 28:
Conversion table: Units for gas throughput
16.2 Technical data
Performance data
● The
tested base pressure
is measured during quality control prior to delivery using a
gas-type-independent measuring device (according to ISO 21360).
Selection field
HiScroll 6, scroll
pump, standard in-
cluding ATEX
HiScroll 6, scroll
pump, without GB,
including ATEX
HiScroll 6, scroll
pump, with auto-
mated GB
ATEX-certification
Ex II 3/-G Ex h IIC T4
Gc X +5 °C ≤ T
a
≤ +40
°C
Ex II 3/-G Ex h IIC T4
Gc X +5 °C ≤ T
a
≤ +40
°C
–
Part number
PD S10 000
PD S10 001
PD S10 002
Connection flange (in)
DN 25 ISO-KF
DN 25 ISO-KF
DN 25 ISO-KF
Connection flange (out)
DN 25 ISO-KF
DN 25 ISO-KF
DN 25 ISO-KF
Cooling method
Air, Forced convection
Air, Forced convection
Air, Forced convec-
tion
Tested base pressure
1.5 · 10
-2
hPa
1.5 · 10
-2
hPa
1.5 · 10
-2
hPa
Intake pressure max.
1100 hPa
1100 hPa
1100 hPa
Recommended continu-
ous inlet pressure, max.
200 hPa
200 hPa
200 hPa
Exhaust pressure, max.
1500 hPa
1500 hPa
1500 hPa
Pumping speed
6.1 m³/h
6.1 m³/h
6.1 m³/h
Technical data and dimensions
75/84
Содержание HISCROLL 12
Страница 52: ...Alternative Switch off via remote interface Remove the bridge between pins 7 ad 5 Operation 52 84...
Страница 83: ...83 84...
Страница 84: ...PU0097 ed B Date 2209 P N PU0097BEN...