5.11.2Connect three phase motor with 9-pin terminal board
5.11.3Connect three phase motor with 12-pin terminal board
5.12 Checking the direction of rotation
5.13 Connecting the PTC thermistor tripping unit
5.14 Connecting operating temperature monitoring
6
6.1
6.2
6.3
6.4
Flushing the screw pump with fluid
6.5
Flushing the screw pump with gas
6.6
7
7.1
7.2
Checklist for inspection and maintenance
7.3
7.4
Checking the cooling liquid level
7.4.1 Approach for the Hepta 100 P
7.4.2 Approach for the Hepta 200 P | 300 P
7.5
7.5.1 Draining lubricant on the motor side
7.5.2 Draining lubricant on the vacuum side
7.5.3 Filling lubricant on the motor side
7.5.4 Filling lubricant on the vacuum side
7.6
7.6.1 Draining the cooling liquid on the Hepta 100 P
7.6.2 Draining the cooling liquid on the Hepta 200 | 300 P
7.6.3 Filling up the cooling liquid on the Hepta 100 P
7.6.4 Filling up the cooling liquid on the Hepta 200 P | 300 P
8
8.1
Decommissioning the vacuum pump
8.2
9
9.1
9.2
10
11
Service solutions by Pfeiffer Vacuum
12
12.2 Ordering accessories
12.3 Consumables
13
13.1 General
13.2 Substances in contact with the media
13.3 Technical data
13.4 Dimensions
Table of contents
4/70
Содержание HEPTA 100 P
Страница 1: ...OPERATING INSTRUCTIONS EN Translation of the Original HEPTA 100 200 300 P Screw pump...
Страница 53: ...3 Screw in the closing screw 4 Switch the vacuum pump on Decommissioning 53 70...
Страница 69: ...69 70...
Страница 70: ...Notizen Notes...
Страница 71: ......
Страница 72: ...PU0072 ed E Date 2108 P N PU0072BEN...