5.9.2 Filling up the cooling liquid on the Hepta 200 P | 300 P
C
o
o
lin
g
liq
u
id
Z
itr
e
c
M-
2
5
1
2
Fig. 14:
Filling up the cooling liquid on Hepta 200 P | 300 P
1 Cooling liquid
3
Sight glass
2 Filler screw
Procedure
1. Unscrew the filler screw.
2. Fill the cooling liquid as indicated on the sight glass.
3. Screw in the filler screw.
4. Check the fill level during operation.
5. Top up cooling liquid as required.
5.10 Filling with lubricant
NOTICE
Property damage from using non-approved lubricant
Attainment of product-specific performance data is not ensured. If non-approved lubricants are used,
all liability and warranty claims against Pfeiffer Vacuum are excluded.
► Use only lubricants approved by Pfeiffer Vacuum.
► Use alternative, application-specific lubricants only following consultation with Pfeiffer Vacuum.
Checking the fill level
The correct fill level is between the MIN/MAX markings or within the ring mark on the sight
glass.
The lubricant type is listed on the rating plate
► Please refer to rating plate of the vacuum pump for type and quantity of intended lubricant.
– Only the lubricant used during initial installation is permissible.
► Contact Pfeiffer Vacuum if you want to use another type of lubricant.
Required consumable material
● Lubricant
Installation
29/70
Содержание HEPTA 100 P
Страница 1: ...OPERATING INSTRUCTIONS EN Translation of the Original HEPTA 100 200 300 P Screw pump...
Страница 53: ...3 Screw in the closing screw 4 Switch the vacuum pump on Decommissioning 53 70...
Страница 69: ...69 70...
Страница 70: ...Notizen Notes...
Страница 71: ......
Страница 72: ...PU0072 ed E Date 2108 P N PU0072BEN...