
8 - 6
Installation and commissioning
8
.02
Commissioning
Before the machine is
commissioned, stopper
1
must
be removed!
●
Clean the machine thoroughly and then
check the oil level (see
Chapter 11
Care and Maintenance).
●
Check the machine, in particular the
electrical leads, for any damage.
●
Have specialists check, whether the
machine can be operated with the
available mains connection.
If there are any irregularities, do
not operate the machine under
any circumstances!
The machine may only be connected to a grounded socket.
●
When the machine is running, the balance wheel must turn towards the operator. If this is not
the case, have the motor adjusted by specialist staff, see
Chapter 12.07 Parameter settings.
●
Connect the machine to the compressed air system. The manometer must display a
pressure of
6 bar.
If necessary, set to the correct value (see
Chapter 11.04 Checking/
regulating air pressure).
8
.03
Switching the machine on/off
●
Switch the machine on or off, see
Chapter 7.01 On/off switch.
Fig. 8 - 08
1
Содержание 3827-4/33
Страница 96: ...14 3 Circuit diagrams Version 10 01 2006 91 191 497 95 Page 1...
Страница 97: ...14 4 91 191 497 95 Page 2 Version 10 01 2006 Circuit diagrams...
Страница 98: ...14 5 Circuit diagrams Version 10 01 2006 91 191 497 95 Page 3...
Страница 99: ...Notes...