
Adjustment
75
13
.05.07
Thread check spring and slack thread regulator
Rule
1. The movement of the thread check spring should be finished when the needle point
punctures the material (spring deflection: approx.
7 mm
)
.
2. The thread check spring should have moved approx.
1 mm
when forming the
maximum thread loop while passing the thread around the hook.
●
Turn the thread tension
1
(screw
2
)
according to
rule
1.
●
Adjust the slack thread regulator
3
(screws
4
)
according to
rule
2.
It may be necessary to deviate from the specified spring deflection for reasons
relating to the sewing technology.
Adjust the slack thread regulator
3
(screw
4
)
by “+“ (= more thread) o “-”
(= less thread).
-
+
4
4
3
2
1
7 mm
Fig. 13 - 08
Содержание 3519-5/01
Страница 38: ...Sewing 38 Double point darts Fig 10 02 0 320 mm 0 320 mm Insertion mark Insertion mark...
Страница 155: ...155 91 191 499 95 Part 7 Version 07 02 12 Circuit Diagram Overview Start 2 Start 1 Air okay...
Страница 156: ...156 Circuit Diagram Overview Version 07 02 12 91 191 499 95 Part 8 A12 CAN3...
Страница 157: ...157 91 191 499 95 Part 9 BDF P1 Version 07 02 12 Circuit Diagram Overview RS232 interface...