background image

English

 

Wire rope winch >LAMBDA< BGV C1 for stages and studios 

04.04.014

 

 

technische Änderungen vorbehalten 

design changes under reserve

 

changements techniques sous réserve

  Seite / page 10 

 

Inspection- and Maintenance Instructions 

Before carrying out inspection and maintenance works, unload the winch appropriately. 

Inspection Intervals 

Maintenance- Inspection Works 

Visual examination of rope - hook (carrying device). 
Function of the winch. 

daily

 

Function of brake (torque without load and wire rope storage on drum) 
Lubricate drive pinion  
Grease gearing  
Check the safety spring crank -ratchet for brake function and wear. 
Examine the rope for wear acc. to DIN15020 page 2 and execute maintenance works. 

quarterly

 

Check the fixing screws for firm seat. 
Arrange for an examination by a competent person.

1)

 

Check all parts of the winch and crank for wear. If necessary, replace defect parts and 
grease them. Only use the grease recommended by us. 
Check name plate for legibility 

annually

 

Brake test (acc. to DIN 56 925) 

No-load torque (without load) of double safety spring loaded brake with torque 
measuring device test. 
No-load torque minimum 

3 Nm

 resp. manual hand force 

12 N

 with 

250 mm

 crank arm 

length. 

 With a low deviation from 

Mmin

 results in an erosion border of the brake spring and 

brake drum, the braking mechanism must be exchanged. 

 When the nominal crank pressure is exceeded in the torque in any direction, the brake 

will break. 

Nominal manual crank pressure with full load 

180 N 

with crank arm length from

 250 mm

Nominal operation torque 

45 Nm 

Re-lubrication of the double safety spring crank and double safety spring locking device 
only by authorised personnel

1)

every 4 years 

The entire installation should be examined by a competent person. 

1) 

for example by Pfaff-silberblau service department. 

The working life of the winch is limited, wearing parts have to be replaced in 
good time. 

Operating material / Recommended lubricant 

Recommended lubricant  

for all grease lubricating points: multipurpose grease according to 

DIN 51825 T1 K 2 K 

for all oil lubricating points: machine or gear oil 

CLP - DIN 51517 T3 ISO VG 100

 

Waste lubricant has to be disposed acc. to legal regulations! 

Operating failures and their causes 

Failure Cause 

Elimination 

In unloaded state, it is 
difficult to turn the 
crank. 

Lubricant in bearing points and 
gearing is missing. 
Dirt or something similar has ac-
cumulated in the gearing. 
Winch was distorted during 
mounting 

Execute maintenance works. 
 
Check the fixing.  
Is the mounting surface even, are the screws tight-
ened correctly? 

Load is not held. 

Brake is worn out or defect. 

Examine brake parts (see examination) and replace 
worn out parts (safety spring crank). 
Replace double safety spring crank. 

Crank force excessive 
(like closed brake) 

One brake spring is broken 

Arrange for an examination by a competent person 

Disposal 

After having placed out of service, the parts of the hand winch have to be recycled 
or disposed according to legal regulations! 

Содержание 030272015

Страница 1: ...niques sous réserve 07 01 2010 UD Seilwinde LAMBDA für Bühnen und Studios Wire Rope Winch LAMBDA for stages and studios Treuil LAMBDA pour des scènes et des studios Prüf Nr Test no No de vérification Type Type Type Art Nr Art No Réf de l article Geräte Fabrik Nr Device Serial number Numéro de série Baujahr Year of manufacture Année de construction Hublast Capacity Capacité ...

Страница 2: ...ngements techniques sous réserve Seite page 2 242 5 M12 min 8 8 250 40 rope pressure drum 340 Ø133 4 280 310 150 Ø13 B 30 5 244 A 5 D C Type 030272015 030272017 030272018 030272019 A mm 379 469 549 629 B mm 180 270 350 430 C mm 175 265 345 425 D mm 225 315 195 475 Bildliche Darstellung unverbindlich Graphic representation not binding Représentation graphique sans engagement ...

Страница 3: ...ftragtes qualifiziertes Personal Definition für Fachkräfte nach IEC 364 Qualifiziertes Personal sind Personen die aufgrund ihrer Ausbildung Erfahrung Unterweisung sowie Kenntnisse über einschlägige Normen und Bestimmungen Unfallverhütungsvorschriften und Betriebsverhältnisse von den für die Sicherheit der Anlage Verantwortlichen berechtigt worden sind die jeweils erf Tätigkeit auszuführen und dabe...

Страница 4: ...ugkraft gesamt daN 300 300 300 300 empf Seil DIN EN 12385 4 15x7K WSC 1960 B sZ Seildurchmesser mm ø6 ø6 ø6 ø6 Mindestbruchkraft kN 33 1 max Seilaufnahme 1 seilig m 1x10 1x14 8 1x19 8 1x24 3 max Seilaufnahme 2 seilig m 2x6 1 2x8 75 2x10 9 max Seilaufnahme als Verschiebewinde m 7 5 13 0 18 0 23 0 max Seillagen 1 1 1 1 erf Kurbelkraft daN 18 18 18 18 Kurbelkraft im Leerlauf daN ca 4 ca 4 ca 4 ca 4 H...

Страница 5: ...rheitshinweis Die Winden sind nur für Handbetrieb geeignet Heben der Last erfolgt durch Drehen der Kurbel im Uhrzeigersinn Senken der Last durch Drehen der Kurbel entgegen dem Uhrzeigersinn Senken Heben Vario Kurbel Die Seilwinde ist mit Vario Kurbel und abnehmbarem Kurbelarm ausgestattet Der Kurbelarm ist in der Länge verstellbar Die Kurbelarmlänge kann immer der Last angepasst werden Kurbelarm m...

Страница 6: ...belkraft wesentlich überschreitet ist eine Bremsfeder gebrochen Nennhandkurbelkraft bei Volllast 180 N bei Kurbelarmlänge von 250 mm Nenndrehmoment 45 Nm Prüfen und nachschmieren der Doppelsicherheitsfedersperre nur durch autorisierte Fachkräfte1 alle 4 Jahre Sachverständigenprüfung der gesamten Anlage durchführen lassen 1 z B durch Pfaff silberblau Kundendienst Die Lebensdauer der Winde ist begre...

Страница 7: ...and maintenance work should only be executed by personnel who are Competent qualified persons definition of experts acc to IEC 364 Qualified persons for reasons of their training experience and instruction are persons who do their necessary activities without danger and who can avoid this danger due to their knowledge of directives regulations for the prevention of accidents and standards These pe...

Страница 8: ...up acc to DIN15020 2 m 2 m 2 m 2 m Capacity daN 300 300 300 300 rec wire rope DIN EN 12385 4 15x7K WSC 1960 B sZ rope ø mm ø6 ø6 ø6 ø6 minimum braking force kN 33 1 max rope reception 1 rope m 1x10 1x14 8 1x19 8 1x24 3 max rope reception 2 ropes 2x6 1 2x8 75 2x10 9 rope reception for shunting winch 7 5 13 0 18 0 23 0 max number of layers 1 1 1 1 required crank force daN 18 18 18 18 crank force wit...

Страница 9: ...sition Operating Instructions Safety Instruction The winch is only suited for manual operation Lifting the load by turning the crank clockwise Lowering the load by turning the crank counter clockwise lowering lifting Vario Crank The winch is equipped with a Vario crank and a detachable crank arm The crank arm is adjustable Suitable when using the winch in confined areas The crank arm with handle d...

Страница 10: ...que in any direction the brake will break Nominal manual crank pressure with full load 180 N with crank arm length from 250 mm Nominal operation torque 45 Nm Re lubrication of the double safety spring crank and double safety spring locking device only by authorised personnel1 every 4 years The entire installation should be examined by a competent person 1 for example by Pfaff silberblau service de...

Страница 11: ...quement par Personnel compétent et qualifié définition des experts selon IEC 364 Les personnes qualifiées selon leur expérience formation et instruction sont des personnes qui effectuent leurs activités nécessaires sans danger et qui peuvent éviter ce danger grâce à leurs connaissances sur les règlements de prévoyance contre les accidents les normes et les directives Ces personnes sont responsable...

Страница 12: ... 15020 1 2 m 2 m 2 m 2 m capacité total daN 300 300 300 300 câble rec DIN EN 12385 4 15x7K WSC 1960 B sZ diamètre de câble mm ø6 ø6 ø6 ø6 force de rupture minimale câble kN 33 1 capacité d enroulement max à un câble m 1x10 1x14 8 1x19 8 1x24 3 capacité d enroulement max à deux câbles 2x6 1 2x8 75 2x10 9 capacité d enroulement 7 5 13 0 18 0 23 0 nombre de couches max 1 1 1 1 effort sur la manivelle...

Страница 13: ...de charge la plus basse Mode d emploi Instruction de sécurité Les treuil ne sont convenables que pour une utilisation manuelle Tourner la manivelle dans le sens des aiguilles d une montre pour lever la charge Le sens inverse pour baisser la charge baisser lever Manivelle variable La manivelle est variable en longueur Ceci permet d adapter la longueur de la manivelle selon la charge Le bras et la p...

Страница 14: ...l effort sur la manivelle nominal dans une direction le ressort à frein est cassé Effort nominal sur la manivelle à main à pleine charge 180 N à une longueur de ma nivelle de 250 mm Moment de couple nominal 45 Nm La manivelle de sécurité à ressort double et le cliquet de sécurité à ressort double doit être regraissés par des experts1 tous les 4 ans Laisser vérifier l installation complète par une ...

Страница 15: ...rmen insbeson dere Applied harmonised standards in particular Normes harmonisées utilisées notamment DIN EN ISO 12100 1 DIN EN ISO 12100 2 FEM 9 756 Angewendete nationale Normen und technische Spezifikationen insbesondere Applied national technical standards and specifica tions in particular Normes et spécifications techniques nationales qui ont été utilisées notamment BGV C1 4 98 BGV D8 DIN 15020...

Страница 16: ...spection prior to first commissioning Inspection avant la première mise en service durch by par Firmenstempel company stamp cachet d entreprise Sachverständiger Competent person expert Sachkundiger Wiederkehrende Prüfungen Regular Inspections Inspections régulières Prüfdatum Inspection Date Date d inspection Befund Result Résultat Unterschrift des Sachkun digen Sachverständiger Signature of a comp...

Страница 17: ...spection prior to first commissioning Inspection avant la première mise en service durch by par Firmenstempel company stamp cachet d entreprise Sachverständiger Competent person expert Sachkundiger Wiederkehrende Prüfungen Regular Inspections Inspections régulières Prüfdatum Inspection Date Date d inspection Befund Result Résultat Unterschrift des Sachkun digen Sachverständiger Signature of a comp...

Страница 18: ...rblau nl www pfaff silberblau nl F Columbus McKinnon France ZI des Forges 18108 VIERZON CEDEX FRANCE Telefon 33 2 48 71 93 40 Telefax 33 2 18 26 00 31 pfaff cmco france com www pfaff silberblau com PL Columbus McKinnon Polska Sp z o o Ul Owsiana 14 62 064 PLEWISKA POLAND Telefon 48 61 6 56 66 22 Telefax 48 61 6 56 66 88 kontakt pfaff silberblau pl www pfaff info pl H Columbus McKinnon Hungary Kft ...

Отзывы: