fORKLIfT OPERaTION
53
Extendo and Traverse Operation and Maintenance Manual
800-GO-PETTIBONE
start-up and Driving
To start the engine:
apply the parking brake.
1.
Place the transmission in NEUTRaL.
2.
NOTICE: Never
operate the starter for more than 20 seconds
continuously. allow 2 minutes between starting
efforts. If using starting fluid for a cold weather
start, inject the starting fluid only while the engine
is cranking. Insert the ignition key into the switch,
turn clockwise and hold. Release the key when the
engine starts. NOTICE: The forklift must be standing
still when selecting any steering mode. Equipment
damage will occur if the mode is selected while the
forklift is moving.
Determine the steering mode.
3.
a. CRaB sTEERING (up to 2 mph). In this position,
all four wheels will turn in the same direction.
Crab steering
figure 36.
b. 4-WHEEL sTEERING (up to 10 mph). In this
mode, the rear wheels will turn in the opposite
direction from the front wheels. This provides
the shortest turn radius.
4-Wheel steering
figure 37.
Note: Before selecting this mode, the rear wheels must
be turned straight using the 4-WHEEL sTEERING
mode, if necessary.
c. 2-WHEEL sTEERING (10 mph or more). In this
position, only the front wheels will steer.
2-Wheel steering
figure 38.
Содержание Extendo 1032
Страница 1: ...Operator s Manual PMOM 4021 736 744 936 944 1032 1144 1157 T944 T1157...
Страница 2: ......
Страница 8: ...vi Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE Contents...
Страница 65: ...FORKLIFT OPERATION 57 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 67: ...FORKLIFT OPERATION 59 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 68: ...FORKLIFT OPERATION 60 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 70: ...FORKLIFT OPERATION 62 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 71: ...FORKLIFT OPERATION 63 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 73: ...FORKLIFT OPERATION 65 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 75: ...FORKLIFT OPERATION 67 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 77: ...FORKLIFT OPERATION 69 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 78: ...FORKLIFT OPERATION 70 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 80: ...FORKLIFT OPERATION 72 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 81: ...FORKLIFT OPERATION 73 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 83: ...FORKLIFT OPERATION 75 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 85: ...FORKLIFT OPERATION 77 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 87: ...FORKLIFT OPERATION 79 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 89: ...FORKLIFT OPERATION 81 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 91: ...FORKLIFT OPERATION 83 Extendo and Traverse Operation and Maintenance Manual 800 GO PETTIBONE...
Страница 119: ......
Страница 120: ...1100 Superior Ave Baraga MI 49908 Phone 1 800 Go Pettibone Fax 906 353 6325 www gopettibone com...