background image

3

Perlick is committed to continuous improvement. therefore, we reserve the right to change specifications without prior notice.

installation and Operating instructions

Sizes and Specifications, Custom Pass-thru Cabinets – remote

Form no. Z2279

rev 08.01.07

34 1/2”

[876]

27 7/16”

[697]

DOOR

OPENING

TYP.

31 1/8”

DOOR

HGT. TYP.

6 3/8”

[163]

31 1/4”

[794]

7 1/2”

[191]

6 1/2”

[146]

15 7/8”

[403]

26 3/4”

[679]

22 3/4”

[578]

R23 1/2”

R23 1/2”

23 1/2”

[597]

23 1/2”

[597]

4 1/8” [105]

6 9/16” [167]

18 3/4” [476]

DOOR SILL

TO  

DOOR SILL

24” [610]

REFRIGERATION &

ELECTRICAL ACCESS

ACCESS RIGHT

OR LEFT

19 7/8”

[505]

DOOR

OPENING

72” [1829] 3 DOOR

48” [1219] 2 DOOR

68” [1727] 3 DOOR

44” [1118] 2 DOOR

mOdEL NOS. 

 

PR48 

PR72   

nUMber OF  DOOrS 

2 Door 

3 Door   

 

Cabinet 

Length 

48” (1219) 

72” (1829)  

DiMenSiOnS 

Depth 

26

3

/

4

” (679) 

26

3

/

4

” (679) 

 

(mm) 

height 

34

1

/

2

” (876) 

34

1

/

2

” (876) 

 

CaSe CaPaCitY 

(based on 12oz. export bottle)

 

12.9 

20.4 

aMPS 

 

.9 

.9 

btU/hr 

 

2060 

2500

Ship Wt. Lbs. (kg.)  

310 (141) 

400 (181)  

interiOr 

door sill:

 high strength polyethylene. 

door pan and ceiling:

 high strength polystyrene. 

floor pan and  

 

Walls: 

Stainless steel. includes pilasters, (2) vinyl coated shelves and floor rack per door, and interior lights.

exteriOr:   

Front, back, top and sides stainless steel. bottom galvanized steel.  

DOOr hinging 

Stainless steel hinges with standard locations as illustrated. For special hinging specify 

 

hinge locations starting from left to right. Field reversible.

DOOr harDWare 

door handles:

 black vinyl with chrome ends.  

Lock finish:

 chrome

reFrigeratiOn 

aluminum fin and copper tube evaporator, epoxy coated coil. 

eLeCtriCaL 

115V, 60hz., 1 phase aC. Contact Perlick for other voltage/ frequency requirements. 

PLUMbing 

Cabinet comes with 4 feet of 

1

/

2

” vinyl tubing for evaporator drain. the tubing exits from the center bottom of  

 

the cabinet thru a 

15

/

16

” Dia. hole in back of the mullion. 

inSULatiOn 

 Foamed-in-place polyurethane, 2” walls, 1

1

/

2

”  top.

OPtiOnaL 

• Leg set 

• Laminated ends 

door finishes 

aCCeSSOrieS & 

• tapping kit - 3 door only 

• brass hardware 

black vinyl coated 

MODiFiCatiOnS 

• Laminated top 

• base plates 

Stainless steel  

 

• Condensate evapaway kit   

Customers choice of laminate  

 

 

 

Prepared for field lamination 

 

 

 

glass door with black vinyl coated frame

 

 

 

glass door with stainless steel frame

 

 

 

glass door with laminated frame 

 

Содержание PR48

Страница 1: ...losed warranty card and mail to the Perlick Corporation to register the warranty If the card is not returned the warranty period will begin from the date the equipment is shipped from the factory This...

Страница 2: ...and copper tube evaporator epoxy coated coil Adjustable temperature control Self defrosting Pull out condensing unit for service and cleaning Compressor left standard ELECTRICAL 115V 60Hz 1 phase AC F...

Страница 3: ...nd Walls Stainless steel Includes pilasters 2 vinyl coated shelves and floor rack per door and interior lights Exterior Front back top and sides stainless steel Bottom galvanized steel Door Hinging St...

Страница 4: ...mage If damage is discovered file your claim immediately with the transportation company Perlick is not responsible for damage in transit Installing Legs Optional Attach four legs to the cabinet botto...

Страница 5: ...Turn the adjusting screw counterclockwise to the left Temperature Control OFF Turn the adjusting screw completely counter clockwise to the O position until a click is noted The condenser fan motor tur...

Страница 6: ...jumper 65051A 65051A Light bulb C15046 C15046 Light bulb guard 65099 1 65099 1 Light socket 63484 63484 Light switch 63303 63303 Lock 63762 63762 Space lock 63761 1 63761 1 Lock rail 65432 24SS or 65...

Страница 7: ...is assembled as the top left bracket Top right bracket is assembled as the bottom left bracket STEP 9 Re insert top hinge pin STEP 10 Re assemble lock rail from STEP 3 Operations to Perform on Door S...

Страница 8: ...N BOX TO CONDENSING UNIT MUST COMPLY WITH ALL LOCAL AND NATIONAL ELECTRICAL CODES CABINET JUNCTION BOX CONDENSING UNIT EVAPORATOR HOUSING GROUND WIRE JUNCTION BOX PRESSURE SWITCH FIELD INSTALLED POWER...

Отзывы: