4
Perlick is committed to continuous improvement. therefore, we reserve the right to change specifications without prior notice.
Preparing the Cabinet for Use –
Pass-thru back bar Cabinets
Form no. Z2279
rev 08.01.07
Parts List
■
(2) Shelves plus (1) Floor rack-per door.
■
Shelf Clips.
Suggested Tools
■
#2 Phillips Screwdriver.
■
10” Crescent Wrench.
■
9
/
16
” allen Wrench.
■
5
/
16
” and
3
/
8
” hex Socket.
■
Power Drill or Driver.
Plumbing
before operating the cabinet, the condensate drain
tube (furnished) must be connected. One end is
attached to the barbed elbow on the evaporator
condensate pan. the other end is inserted through
evaporator drain hole and exits the bottom of the
cabinet. the drain hole is located in the cabinet floor
pan, behind the vertical door mullion.
the drain tube must be placed over a floor drain or
into a condensate management system such as a
“COnDenSate eVaPaWaY” pan and heater.
Electrical
the cabinet must be connected to a separately
fused power source (see electrical specification
plate) and grounded in accordance with national
and Local electrical Codes. Caution: Do not
attempt to operate the equipment on any other
power source than that listed on the electrical
Specification plate.
Uncrating and Inspection
remove all crating material before operating.
Carefully inspect cabinet for hidden damage. if
damage is discovered, file your claim immediately
with the transportation company. Perlick is
not responsible for damage in transit.
Installing Legs
(Optional)
attach four legs to the cabinet bottom. Use the
supplied
1
/
4
”- 20 x
3
/
4
” hex head self-tapping
machine screws.
Placing the Cabinet
Position the cabinet into place using rollers when
necessary.
Important:
Proper air flow around the
condensing unit is necessary for efficient operation.
never obstruct the air flow in and out of the
condensing unit.
Leveling the Cabinet
When the cabinet is in place, check installation with
carpenter’s level. When level front to back and left
to right, accumulated water will drain out of cabinet
evaporator drain.
Electric Condensate Evapaway kit
(Optional)
a 115-volt electric condensate pan can be installed
underneath the cabinet to collect and evaporate the
condensate from the cabinet evaporator. a 6 foot - 3
prong plug is included. a separate circuit should be
provided for the heater. the kit can be used only on
cabinets with 4” minimum legs. it can not be used
with platform or baseplate kits..
Installing base Plate
(Optional)
attach brackets to cabinet bottom in holes pro-
vided. attach base plate to brackets. (See separate
instructions, provided with kit). When returning
cabinet to upright position, be careful not to bend
brackets.
WARNING! — Self Contained Units
To avoid compressor damage,after returning
cabinet to an upright position, let unit stand for
24 hours before plugging it in and running the unit.