
MAINTENANCE PROCEDURES
4012/16 Gas, February 1998
39
EQUALISING BRIDGE PIECES AND
SETTING VALVE CLEARANCES
NOTE:
The bridge pieces must be set before
attempting to set the valve clearances.
Remove the 4 screws (1) from the rocker
cover (2), lift off the cover peel off and throw
away the old gasket (3) Pull the spark plug
lead tube (4) from the spark plug bush (see
Fig. 29
).
To
equalise
the
bridge
pieces
the
appropriate valves must be rocking, use the
table below.
In order that the engine may be rotated
while the batteries are disconnected a
special cranking device (SE253) can be
fitted to the spare starter motor hole in the
flywheel housing (see
Fig. 30
).
Using a
socket and ratchet wrench press against the
spring loaded bolt head until the pinion
engages with the flywheel gear then crank
the engine to the desired position.
If the valves required to be rocking are
closed rotate the engine one revolution
which will bring these valves to the rocking
position.
The flywheel housing has an
inspection
hole
directly
below
the
turbocharger through which the flywheel
markings may be seen to line up with the
pointer set in the flywheel housing (see
Fig.
31
).
The flywheel is marked:
T.D.C. (Top Dead
Centre)
4012TESI
4016TESI
A1-A6
A1-A8
A5-A2
A3-A6
A3-A4
A7-A2
B1-B6
A5-A4
B5-B2
B1-B8
B3-B4
B3-B6
B7-B2
B5-B4
DISCONNECT
BATTERIES OR ANY
OTHER MEANS OF STARTING.
WARNING
Fig. 29
1
2
3
4
Fig. 30
1
2
Fig. 31
Содержание 4012TESI Series
Страница 1: ...TSL4187E Issue 1 February 1998 User s Handbook Perkins 4012 and 4016 Gas 4012TESI 4016TESI...
Страница 7: ...4012TESI MINNOX 4012TESI MINNOX...
Страница 8: ...4016TESI MINNOX 4016TESI MINNOX...
Страница 49: ...4012 4016 GAS ENGINES FAULT TRACING CHART 4012 16 Gas February 1998 45 Fig 34...
Страница 57: ...1998 Perkins Engines Company Limited All Rights Reserved...