Using the RamanMicro 200 Series . 65
SOP-2: Turning the Instrument Off
1.
Shut down Spectrum software by selecting Exit from the File
menu to return to the
Windows operating environment.
2.
Switch off the PC and monitor.
3.
Switch off the spectrometer by pressing the power switches on the PSUs to OFF:
- ON
Ο
- OFF
4.
Switch off the microscope illumination, and then the microscope.
5.
If appropriate, switch off the stage controller box.
However, we recommend that you leave the stage controller box switched on, even if
you switch off the instrument and microscope. If the stage control box is switched off,
you will need to reset the stage upon restarting the software.
6.
If appropriate, ensure that all sample holders have been removed from the stage in
preparation for the next time the instrument is used.
After Spectrum closes, if you do not switch off the instrument it will remain active for
5 minutes. This is so that you do not have to wait for the CCD detector to cool and the laser
to stabilize should you need to exit Spectrum and then restart the software immediately, or
when changing methods in the AssureID software application.
NOTE: For information on how to use AssureID with a triggered fiber optic probe, refer to
the AssureID on-screen help.
The instrument will shut down automatically after the appropriate time period. You can shut
down the instrument by right clicking on the Raman instrument icon in the Notification area
of the Windows Taskbar and accessing the shortcut menu.
You can shut down your PC when the Raman instrument icon is displayed. The system will
shut down.
NOTE: If Spectrum software stops responding, refer to
starting on page 94
for details of how to shut down the instrument and restart the software.
Содержание RamanMicro 200 Series
Страница 1: ...RamanMicro 200 Series Getting Started Guide MOLECULAR SPECTROSCOPY...
Страница 5: ...Introduction...
Страница 10: ...10 RamanMicro 200 Series Getting Started Guide...
Страница 11: ...Safety Practices...
Страница 27: ...Raman History Theory and Instrumentation...
Страница 33: ...Preparing Your Facility...
Страница 37: ...Installing Your RamanMicro 200 Series...
Страница 57: ...Using the RamanMicro 200 Series...
Страница 89: ...Maintenance and Troubleshooting...
Страница 98: ...98 RamanMicro 200 Series Getting Started Guide...