![Pentair Raychem HWAT System Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/pentair/raychem-hwat-system/raychem-hwat-system_installation-and-operation-manual_1525813023.webp)
19
6
Thermal Insulation
Raychem-IM-H57548-HWATsystem-EN 16/08
• Splice and Tee connection kits may be installed
above the insulation using the optional SB-04
mounting bracket. The pipe and heating cable ser-
vice loops must be fully insulated as shown above.
Figure 16: Installing connection kits below insulation.
• Make sure that all heat-traced piping, fittings, wall
penetrations, and branch piping are insulated.
Correct temperature maintenance requires proper-
ly installed and dry thermal insulation. Uninsulated
sections of pipe can result in cold spots.
• After installing insulation, electrical codes require
that you install “Electric Traced” labels along the
piping at suitable intervals (10-foot intervals rec-
ommended) on alternate sides.
WARNING: Use only fire-resistant insulation,
such as fiberglass.
Содержание Raychem HWAT System
Страница 4: ...iv Raychem IM H57548 HWATsystem EN 16 08 10 Test Procedures 34 11 Troubleshooting Guide 38...
Страница 46: ...42 Raychem IM H57548 HWATsystem EN 16 08...
Страница 47: ...43 Raychem IM H57548 HWATsystem EN 16 08...
Страница 54: ...vi EN RaychemHWATECOcontroller IM H57340 03 13...
Страница 109: ......