FLECK
7000SXT Service Manual
•
19
REMOVING GEAR BOX ASSEMBLY
40988 REV A
Figure 3
1. Unplug the power source.
2. With 3/8" nut driver, turn the cycle cam counter-clockwise
to the position shown in illustration above.
3. Slightly pull the two tabs outward and push the gearbox
slightly upward to remove.
4. When returning valve to service after powerhead
disassembly, manually step valve through regeneration
using the extra cycle button until valve is in service.
INSERTING CIRCUIT BOARD
1. To insert the circuit board, align the notches on the left
side of the board with the flexible finger on the powerhead.
Apply pressure to the left while rotating the board back.
41033 REV B
Figure 4
2. When all the way down, snap the circuit board into place
under the notches on the right.
41033 REV B
Figure 5
CONNECTING THE CIRCUIT BOARD
After the circuit board is installed:
1. Connect the motor wires (A) to the motor connector (A1) on
board.
2. Connect the transformer cable (B) to the transformer
connector (B1) on board.
3. Connect the meter cable (C) to the meter cable connector
(C1) on board.
4. Connect the meter cable sensor end to the opening on the
valve body.
5. Thread meter cable (D1) and power wire (D2) along path
shown in illustration.
2
B
1
A
A1
B1
C1
3
C
4
D2
D1
41033 REV B
Figure 6
Содержание Fleck7000SXT
Страница 1: ...FLECK 7000SXT SERVICE MANUAL...
Страница 21: ...FLECK 7000SXT Service Manual 21 INJECTOR FLOW DATA TR18755 REV B...
Страница 23: ...FLECK 7000SXT Service Manual 23...