Installer manual Fleck 3150 NXT/NXT2 - Installation
Ref. MKT-IM-010 / C - 18.10.2019
51 / 182
5.7.7.2
System operation in regeneration
The primary tank regenerates when its remaining volume becomes zero. The next tank
with the least remaining volume becomes the new primary tank. The tank with the next
least volume remaining will be the first to be activated when the flow rate reach the
programmed trip point. Tanks continue operating in this order.
Inlet
Check valve
Valve
Outlet
Tank
Meter
New
primary
tank
3rd in
standby
In regen
1st in
standby
2nd in
standby
If two tanks are in service and both becomes exhausted at the same time, the other
two tanks will shift from standby into service. The lead tank with exhausted capacity
will start regeneration. The second tank with exhausted capacity will enter into standby.
If the flow increases and exceed the trip point, a third tank must move into service
position. The tank in standby with exhausted capacity will shift into service to maintain a
steady flow. Operating for extended periods in this mode may degrade the water
quality.
Содержание FLECK 3150 NXT
Страница 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Страница 137: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 137 182 AC motor DC motor ...
Страница 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Страница 141: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 141 182 AC motor DC motor ...
Страница 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Страница 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Страница 182: ...www pentairaquaeurope com ...