
19
Installation
Attention: Before installation, ensure power is disconnected!
Grounding (earth bonding) is required. The unit should be installed by a
qualified service person and grounded. Installation should allow access to
cell buttons and power center.
Read Safety Precautions and Important Instructions on
page 1
.
Before attempting any
electrical wiring, be sure to read and follow
Safety Instructions. Wiring should only be
performed by a qualified
professional.
●
Install the CFICGEN unit a minimum of three (3) feet away from the
heater outlet.
●
Pipe couplings: Schedule 80, maximum pressure 75 psi at 70F
(21
℃
).
How to install Cell:
1.
Using PVC glue, mount the PVC couplings to the plumbing pipe.
Allow the glue to dry.
2.
Mount the cell vertically. Allow access to the cell operator control
panel. Install the cell onto the couplings. Ensure the O-rings are
seated properly.
3.
Switch on the pump and visually inspect for leaks around the
couplings.