REGULATION INSTRUCTIONS
35
4.3 Flushing the system
Failure to flush and add inhibitor to the system will invalidate the appliance warranty.
All systems must be thoroughly drained and flushed using additives
– corrosion inhibitors and
flushing agents/descalers. Pensotti requires the use of the supplied Fernox Commissioning Kit or
individual containers of Fernox F3 or F5 cleaner and F1 protector. Follow Fernox installation
instructions. Failure to use Fernox F3 or F5 cleaner and F1 protector could void the warranty for all
waterside components.
To flush out the primary side of this unit
a.
Fill the water heater as per the filling instructions.
b.
Using a drain off cock on the lowest point of the system allow the water to drain from the system and
water heater.
c.
In order to flush the system correctly turn off all radiators open the filling loop and drain cock
simultaneously and allow the water to flow through the water heater.
d.
Open each individual radiator allowing water to flow through then turn that radiator off and repeat for all
radiators on the system.
e.
Turn off the filling loop and close the drain cock open all radiators and open the filling to fill the system.
f.
Continue to fill the system until the pressure gauge reads in the Green section of the gauge (14.5 psi (1
bar)).
To flush out domestic hot water circuit
a.
Open all hot water outlets.
b.
Turn on inlet group supply so water enters the water heater; leave to fill until water is released from the
hot water outlets. Turn off all hot water outlets.
c.
Connect a hosepipe to the cylinder drain cock and open the drain cock.
d.
Allow water to flow through the water heater and out of the drain cock.
e.
Turn off water supply, disconnect the hosepipe, close the drain cock and refill the water heater.
4.4 Filling the condensate trap
The condensation trap must be pre-filled when
starting the combination water heater for the first
time in order to prevent flue gases from flowing
back through the trap.
The filling operation is carried out as follows (see
fig. 1):
Remove plug
T
and fill the trap
S
three
quarters full with water;
Replace plug
T
and connect the drainpipe
P
into
a
condensate
discharge
trap
conforming to current legislation;
Attention!
It is recommended to clean the
condensate trap, after a few months of boiler
operation, to remove deposits/residuals left
after the first condensate passage within the
boiler new components that may interfere with the correct operation of the trap itself.
T
S
Fig.
1
Содержание PCI 18
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERALInformation 6 ING ...
Страница 10: ...GENERALInformation 7 ...
Страница 11: ...GENERALInformation 8 ...
Страница 25: ...INSTALLATION INSTRUCTIONS 22 3 6 Piping Diagram ...
Страница 33: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Страница 34: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Water Heater Is A PAHVK Horizontal Kit ...
Страница 63: ...INSTALLATION INSTRUCTIONS 59 6 8 Wiring diagrams ...
Страница 69: ...65 6 13 Sequence of operations ...
Страница 70: ...66 Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...