9-1-2009
10
The Quatech boiler should be equipped with a burner that includes a 15 second pre-purge control.
This will insure smooth quiet starts and optimum operating performance. The use of a post purge is
recommended with mechanical draft systems.
Figure 5, figure 6, figure 7, and figure 8, show wiring diagrams for use of the
Honeywell L7248 and the Carlin 90000B high limit controller along with installation
for a powerventer application and the wiring of a priority indirect with a Taco SR503
or equivalent.
Содержание DK2-3
Страница 5: ...9 1 2009 4 JACKET ASSEMBLY AND CONTROL INSTALLATION ...
Страница 8: ...9 1 2009 7 ...
Страница 9: ...9 1 2009 8 ...
Страница 12: ...9 1 2009 11 ...
Страница 27: ...9 1 2009 26 PARTS LIST AND BOILER DIAGRAM ...
Страница 29: ...9 1 2009 28 ...