
2.
Be sure the storage tank shutoff valve is in the closed position. Use the supplied sy-
ringe and add 5ml of the supplied sanitizing solution to the green tank tubing attach-
ed to the storage tank. Connect the open end of the green tubing from the tank to the
RO units post carbon filter inlet tee fitting. Leave the tank valve closed.
3.
Connect the orange tubing from the angle stop supply valve to the RO unit at the
sediment filter inlet fitting. When facing the unit, this is the far right sump.
Permeate Pump Installation
- If the system is equipped with a permeate pump, clip
the pump to the membrane housing using the supplied mounting bracket and make
the connections to the pump using the label on the pump and the flow diagrams pro-
vided. The
BRINE OUT
connection will be made in the following step.
17
Содержание 200-PWARO Series
Страница 1: ...Penguin Water Reverse Osmosis System 200 PWRO XXXX 200 PWRO XXXX P 200 PWARO XXXX 200 PWARO XXXX P...
Страница 4: ...Pre and Post Filters Membrane Pre Installed Alkaline Filter Included with 6 Stage System 4...
Страница 25: ...Standard Flow Diagram 25...
Страница 26: ...Permeate Pump Flow Diagram 26...
Страница 27: ...6 Stage RO Flow Diagram 27...
Страница 28: ...6 Stage RO Permeate Pump Flow Diagram 28...