
If an air gap faucet is being used, follow this next set of steps.
1.
Connect the 1/4" drain line from the RO module to the smaller brass barb on the bot-
tom of the faucet. Be sure the tube is completely pushed on the barb or a leak could
occur. If using a permeate pump, this connection will be made later in the installation.
2.
Now push a piece of 3/8" black tubing onto the larger brass barb on the bottom of the
faucet. Be sure the tube is completely pushed on the barb or a leak could occur.
Leave the other end of the black tube unconnected for now. It will be connected later
in the installation.
Feed Water Angle Stop Valve and Tubing Installation
1.
To install the angle stop valve, turn off the cold water supply valve for the sink faucet.
Open the sink faucet cold water and relieve the pressure.
12
Содержание 200-PWARO Series
Страница 1: ...Penguin Water Reverse Osmosis System 200 PWRO XXXX 200 PWRO XXXX P 200 PWARO XXXX 200 PWARO XXXX P...
Страница 4: ...Pre and Post Filters Membrane Pre Installed Alkaline Filter Included with 6 Stage System 4...
Страница 25: ...Standard Flow Diagram 25...
Страница 26: ...Permeate Pump Flow Diagram 26...
Страница 27: ...6 Stage RO Flow Diagram 27...
Страница 28: ...6 Stage RO Permeate Pump Flow Diagram 28...