
4.
Be sure the blue handle on the angle stop valve is in the closed position (as pic-
tured). Now open the sink shutoff valve and check the angle stop connections for
leaks. If there are leaks, repair them now. If there are no leaks, connect the orange
tubing to the angle stop valve. Leave the other end of this tubing unconnected for
now. It will be connected later in the installation.
Drain Saddle Installation
Prior to Drain saddle installation, it is important to inspect the condition of drain pipes to
make sure they are not thin and frail. Drain saddle valves are designed to be installed on
standard 1-1/2" OD drain pipe. Install the drain saddle valve above the trap (between the
sink and trap) and on the vertical or horizontal tailpiece. Never install a drain saddle valve
close to the outlet of a garbage disposal or plugging of the RO drain line may result.
1.
Position the port side of the drain saddle valve at the selected location and mark for
the opening. Never position the opening at the bottom of the pipe. A side or top posi-
tion is recommended. Install the rubber gasket on this half of the drain saddle. Be
sure the gasket hole is lined up with the port hole.
2.
Drill a 1/4" hole (3/8" hole if using an air gap faucet) at the spot previously marked.
Take care not to drill through both sides of the pipe.
14
Содержание 200-PWARO Series
Страница 1: ...Penguin Water Reverse Osmosis System 200 PWRO XXXX 200 PWRO XXXX P 200 PWARO XXXX 200 PWARO XXXX P...
Страница 4: ...Pre and Post Filters Membrane Pre Installed Alkaline Filter Included with 6 Stage System 4...
Страница 25: ...Standard Flow Diagram 25...
Страница 26: ...Permeate Pump Flow Diagram 26...
Страница 27: ...6 Stage RO Flow Diagram 27...
Страница 28: ...6 Stage RO Permeate Pump Flow Diagram 28...