
3.
Position both halves of the drain saddle on the drain pipe so the quick connect open-
ing lines up with the the previously drilled hole. A screwdriver may be used to keep
the holes oriented during the tightening process.
4.
Secure the drain saddle clamp on the drain pipe with the provided nuts and bolts.
(Do not over tighten. Make sure there is equal space between saddle halves on each
side.)
5.
Install the black drain line to the port on the drain saddle. If using an air gap faucet,
connect the 3/8" black line from the larger brass barb to the drain saddle.
Tank Installation
1.
Apply Teflon tape to the tank outlet threads. 3 - 4 wraps will be sufficient.
2.
Install the tank valve by turning it clockwise. Tightening it hand tight is usually ade-
quate but additional tightening may be required.
3.
Once the valve is installed, connect the green 3/8" tubing to the tank valve. Leave
the other end of the tubing loose. It will be connected later in the installation.
NOTE:
Tanks are pre-pressurized at 7 psi. Prior to installation, check and add or re-
lease as required. Tanks should always maintain 7 psi
15
Содержание 200-PWARO Series
Страница 1: ...Penguin Water Reverse Osmosis System 200 PWRO XXXX 200 PWRO XXXX P 200 PWARO XXXX 200 PWARO XXXX P...
Страница 4: ...Pre and Post Filters Membrane Pre Installed Alkaline Filter Included with 6 Stage System 4...
Страница 25: ...Standard Flow Diagram 25...
Страница 26: ...Permeate Pump Flow Diagram 26...
Страница 27: ...6 Stage RO Flow Diagram 27...
Страница 28: ...6 Stage RO Permeate Pump Flow Diagram 28...