![Pelton & Crane Helios HL3CB Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/pelton-and-crane/helios-hl3cb/helios-hl3cb_installation-manual_1523566023.webp)
23
053154 r17
Tripod and Column Installation
Drill three 3/16” (4.5 mm) pilot holes to mount lag bolts.
Drill three 3/4” (19 mm) holes through ceiling.
Secure tripod and ceiling plate to framing with
5/16” x 4” lag bolts and washers. The 3/4” diameter spacers
should be in direct contact with the framing. Insert ceiling
plate between the 3/4” spacers and adjusting nuts.
noTe:
If spacers rest against soft sheetrock,
acoustical tile or plaster, the Helios light may be
unstable.
WaRnInG:
Set screws must be tightened securely
and roll pins installed to prevent column from
unscrewing during operation. Failure to install roll pins
and tighten set screws securely could result in the
Helios Light falling from ceiling.
Main Power Connection
Route incoming electrical supply through the provided cable
clamp. Connect the line, neutral and ground to the appropriate
terminals.
CeIlInG MoUnTeD HelIos InsTallaTIon
Set Screw
(100 KG)
Light Power Cable
from Ceiling Mt. Arm
Collar
Roll Pin
5/16" x 4" lag bolt
(3)
Locking set
screws
Spacer
Adjustment
Nut
Tripod
Содержание Helios HL3CB
Страница 1: ...Installation Manual Helios Light ...
Страница 43: ...43 053154 r17 NOTES ...