![Pelton & Crane Helios HL3CB Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/pelton-and-crane/helios-hl3cb/helios-hl3cb_installation-manual_1523566020.webp)
20
053154 r17
Provide adequate framing to support approximately 200 pounds live load. Framing should allow all four
mounting bolts to enter solid wood.
Provide a 1.0 amp, 115VAC, 60HZ supply and protect it with a 15 amp fuse or breaker.
Install wall switch between power supply and light power supply transformer. This provides for safety and
convenience during installation and service. Wall switch can be switched OFF during electrical storms to
prevent transformer damage caused by voltage overloads. Wire nuts are furnished.
Wall & CabIneT MoUnT HelIos InsTallaTIon
noTe:
Steps 1 through 4 are for Wallboard
Installation only:
1. Position wallboard over the located studs with the
lower marks 60” from the floor.
2. Position a level over wallboard. Using the
centerlines, verify that marks are level. Mark holes
using an awl or scribe by piercing the wall through
the hole.
3. Drill pilot holes 1/4” diameter in the wall at the
marked position.
4. Insert the four 3/8” lag bolts into the concave
washers. Be certain the bolt heads fit inside the
concave depression on the washer. Mount the
wallboard with the lag bolts and snap the bolt
head covers on the washer flanges.
5. Connect the power supply to the transformer
terminal strip, line, neutral and ground.
Wall & Cabinet:
6. Locate the mounting bracket. Line up holes in the
bracket with the holes drilled in the cabinet wall.
Install transformer mounting bracket using the
four 1/4-20” bolts and washers making sure the
mounting bracket is level.
noTe:
If ceiling clearance is less than 104”, slide the
Pole into the Mounting Bracket before fastening
Mounting Bracket to structural channel.
7. Place nylon washer and rotation stop clamp on pole
(mount end) and install pole pivot adapter into the
mounting bracket.
8. If required, turn the adapter so the rotational stop
feature on the stem assembly is turned toward the
head of the chair the light is being installed onto.
9. Install the locking key and secure it with the locking
screw.
23”
37”
Lower Position
Upper Position
CL
Wall Delivery
Wall Mounting Board
56-1/2”
78-1/2”
89-1/4”
3”
93”
60”
60”
77”
16”
16”
8”
FLOOR
LIGHT
120°
350°
CL
CHAIR
W
ALL
W
ALL
330°
22”
53-1/2”
FLOOR
28”
Содержание Helios HL3CB
Страница 1: ...Installation Manual Helios Light ...
Страница 43: ...43 053154 r17 NOTES ...