DK9802C2 PV50c user manual ENG
Vers: C2 page4/38
1
General
This instruction manual is an integral and essential part of the product and must be kept by the user or
system manager. The owner / user shall read and understand this manual before installation and
operation of the boiler. This manual is intended for all users and contains general information,
installation instructions and handling with PV50c burner.
The manufacturer of the equipment, Pelltech OÜ, demands that the operator of the device is
competent and has sufficient knowledge in the field. The manufacturer does not take responsibility any
damage done to the equipment, personal injury, harm to animals or property damage if an
incompetent person or persons performs work for which he is not qualified or if the person operating
of the device fails to observe the instructions contained in the manual.
Note:
Operator is the person or persons responsible for the installation, operation, adjustment,
maintenance, cleaning, repair or removal of the machinery.
1.1
Unit description
PV50c pellet burner is designed for solid fuels combustion in form of pellets. The burner operates
automatically and does not require supervision. The burner is designed to work with central heating
boilers for solid fuels, as well as several models of gas or oil boilers with a combustion chamber enabling
the collection of ash. The burner is an ecological device as it uses fuel from renewable sources. It also
features a small demand for electricity.
Main technical data and dimensions are given in section Specifications. Main components of burner are
depicted in Figure 4 and described in Table 2.
1.2
References to other documents
Following document is original user and installation manual for PV50c. In this document are references
made to:
DK0391 - Software and problem handling manual for PV20…PV500
2
Safety
Read and follow these directions carefully. Read the safety instructions carefully before installation.
Always follow the safety instructions during installation and during maintenance.
Installation, operation, service and other work must be carried out by qualified personnel in accordance
with local codes and regulations.
Proper installation of the burner is necessary for safe and efficient operation. Installing this product
improperly may result to damage of the goods. Contact your local building inspector to obtain any
necessary permits or inspection guidelines before installing the product. Contact local building or fire
officials about restrictions and installation inspection requirements in your area. Contact your local
authority (such as municipal building department, fire department, fire prevention bureau, etc.) to
determine the need for a permit. A working smoke detector is required and must be installed in the same
room as the boiler.
Содержание PV50c
Страница 1: ...PV50c pellet burner User manual DK9802C2...
Страница 38: ...20 Declaration of confirmity...