i. Fig. 16 shows the Z8 wired to a Heat Pump HVAC unit. (Page 21)
j. Fig. 17 shows the Z8 wired to a Heat Pump HVAC unit with a Bypass. (Page 22)
k. Fig. 18 shows the Z8 wired to a Heat Pump HVAC unit with a Bypass and Economizer. (Page 23)
l. Fig. 19 shows the Z8 wired to a Heat Pump HVAC unit with a VFD. (Page 24)
m. Fig. 20 shows the Z8 wired to a Heat Pump HVAC unit with a VFD and Econmizer. (Page 25)
n. Fig. 21 shows the Z8 wired to a Heat Pump HVAC unit with an Econmizer. (Page 26)
o. Fig. 22 shows the Z8 wired to a Boiler. (Page 27)
4
.
Once the Z8 is installed and wired to the HVAC unit, follow the configuration sections starting on Page
28. The Z8 Configuration Sections shows configuration options for the Z8 as follows:
a. Step 1: Pelican Web App (Page 28)
b. Step 2: Z8 Serial Number (Page 28)
c. Step 3: System Configuration Options (Page 28)
d. Step 4: Static Management Configuration Options (Page 29)
e. Step 5: Economizer Configuration Options (Page 29)
f. Step 6: Boiler Control Configuration Options (Page 30)
g. Step 7: Input Sensors Configuration Options (Page 30)
5
.
Install the zone thermostats by following the
Zone Damper Installation Guide
(if not already completed)
which was provided with the Z8.
6. Use the provided Check-Out and Verification Document provided with the Z8 to confirm proper operation
of the equipment and the zoned solution.
11