![Pego 100N MASTER Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/pego/100n-master/100n-master_use-and-maintenance-manual_1521986029.webp)
PLUS
300 EXPERT
U THR
Pag. 29
USE AND MAINTENANCE MANUAL
Rev. 01-18
DAY/NIGHT CYCLE FOR GERMINATION LIGHTS
By setting parameter Cg (Germination/seasoning cycle) at second programming level, it is
possible to choose the use of the programmes or a special program suitable for day/night
cycles:
Cg = 0 (default) activates the automatic programmes management for seasoning;
Cg = 1 activates the management of the germination day/night cycle.
By means of the parameters indicated in paragraph 5.11, it is possible to determine the
day start and end times and manage two differential temperature setpoint.
During the day phase, the germination lights are switched on and the display shows the
references of phase 0 switched-on. During the night phase, the germination lights are
switched-off and the references of phase 4 switch-on.
The connection of the germination lights is separate from the cell light that can be used as
service light (managed as usual from the microdoor and the light key).
The current relay of refreshment will become dual function. If Cg=1 is selected, it will no
longer be the relay of refreshment but becomes the relay of germination lights.
The day / night cycle starts by pressing the cycle start key.
5.23
CHAP. 5 - Parameters programming