49
BOILER CONTROL: INTERNAL WIRING & OPERATION
N. IGNITION SEQUENCE
Figure 8.6: Ignition Sequence
Outdoor
Reset
Parameters
Parameter Function
Unit/Value
Default
Options
19
Boiler Supply Design Temperature
– Sets the reset curve design temperature that will be targeted when the outdoor temperature
is at the chosen outdoor design temperature.
– For default: Boiler will target 180°F when the outdoor temperature is 23°F or lower.
°F (°C)
179.6 (82.0)
20
Outdoor Design Temperature
– Sets the Outdoor Temperature at which the boiler will target the Boiler Supply Design
Temperature.
– For default: Boiler will target 190°F when the outdoor temperature is 23°F or lower.
°F (°C)
11.3 (-11.5)
21
Boiler Mild Weather Temperature
– Sets the reset curve design temperature that will be targeted when the outdoor temperature
is at the Outdoor Mild Weather temperature.
– For default: Boiler will target 104°F when the outdoor temperature is 68°F.
°F (°C)
100.4 (38.0)
22
Mild Weather Design Outdoor Temperature
– Sets the Outdoor Temperature at which the boiler will target the Boiler Mild Weather Design
Temperature.
– For default: Boiler will target 104°F when the outdoor temperature is 68°F.
°F (°C)
68.0 (20.0)
23
Minimum CH Setpoint – Design Supply minimum (limit)
– Sets lower limit of Calculated CH setpoint.
– Calculated CH setpoint will always be at or above this value.
°F (°C)
79.7 (26.5)
24
Maximum CH Setpoint – Design Supply Maximum (limit)
– Sets upper limit of Calculated CH setpoint.
– Calculated CH setpoint will always be at or below this value.
°F (°C)
179.6 (82.0)
25
Warm Weather Shutdown Temperature
– Outdoor temperature that will block all CH demands until temperature falls below this value.
°F (°C)
71.6 (22.0)
26
Boost Function: Increment
– Calculated Setpoint increase after boost delay time period is met.
– Boost will continually increase setpoint every boost time period until demand is met or
Maximum CH Setpoint design limit is reached.
°F (°C)
0.0 (0.0)
27
Boost Function: Delay
– Time delay before boost function activates during a single demand.
min.
120
Table 8.8: Outdoor Reset Parameters
Содержание PureFire PFC-625
Страница 1: ...PureFire Boilers PFC 625 PFC 750 Gas Installation Operation Maintenance Manual ...
Страница 24: ...22 WATER PIPING CONTROLS Figure 4 4 Recommended Piping One Boiler with Multiple CH Zones One DHW Tank ...
Страница 25: ...23 WATER PIPING CONTROLS Figure 4 5 Recommended Piping Multiple Boilers with Multiple CH Zones One DHW Tank ...
Страница 36: ...34 ELECTRICAL CONNECTIONS INTERNAL WIRING Figure 7 4 Internal Wiring Schematic for PFC 625 PFC 750 boilers ...
Страница 58: ...56 J LIGHTING OPERATING INSTRUCTIONS Figure 9 1 Lighting Operating Instructions START UP PROCEDURE ...
Страница 76: ...74 REPAIR PARTS 2 9 8 7 2 4 2 1 3 6 6 5 2 10 5 Figure 13 3 Supply Return Piping ...
Страница 78: ...76 REPAIR PARTS 18 16 17 6 14 15 9 4 3 1 8 13 18 7 19 2 10 11 12 5 Figure 13 4 Jacket Assembly ...
Страница 82: ...80 REPAIR PARTS Figure 13 6 Condensate System 1 2 4 7 5 15 15 8 11 3 10 15 6 15 15 12 15 13 15 9 15 14 15 ...
Страница 87: ...85 SERVICE LOG SERVICE LOG Date Serviced By Description of Service Serial Number ...