40
BOILER CONTROL: INTERNAL WIRING & OPERATION
Menu Item
Function/Description
Default Value
Supply Temperature
Actual Supply Temperature From Supply Dual Sensor
O
F (
O
C)
Supply 2 Temperature
Actual Supply 2 Temperature From Supply Dual Sensor
O
F (
O
C)
Return Temperature
Actual Return Temperature
O
F (
O
C)
DHW Temperature
Actual DHW Temperature
O
F (
O
C)
DCW Temperature
Actual DCW Temperature
O
F (
O
C)
Outside Temperature
Actual Outside Temperature
O
F (
O
C)
Flue Temp
Actual Flue Gas Temperature From Flue Gas Dual Sensor
O
F (
O
C)
System Temperature
Actual System Temperature
O
F (
O
C)
0-10V Input
Actual 0-10V External Input
V
RT Input
Actual Room Thermostat Status
open/closed
Fan Speed
Actual Fan Speed
RPM
Ionization
Actual Flame Signal Ionization Current
uA
State
Actual Burner State
Standby
PrePurge0
PrePurgePreIgnit
Ignit
FlameProving
Burn
PostBurn
PostPurge0
PostPurge1
ExtendedPostPurge
Alarm
Error
Actual Lock, Block or Warning Error Code
#
Calculated Setpoint
Actual CH Setpoint
O
F (
O
C)
Table 8.I.2: Information -> Boiler Status
Menu Item
Function/Description
Default Value
Successful Ignitions
Displays the number of Successful Ignitions
#
Failed Ignitions
Displays the number of Failed Ignitions
#
Flame Failures
Displays the number of Flame Losses
#
Operation Days
Displays the total time in operation
days
CH Burner Hours
Displays the amount of burn hours for CH
hrs.
DHW Burner Hours
Displays the amount of burn hours for DHW
hrs.
Table 8.I.3: Information -> Boiler History
Содержание PureFire PFC-625
Страница 1: ...PureFire Boilers PFC 625 PFC 750 Gas Installation Operation Maintenance Manual ...
Страница 24: ...22 WATER PIPING CONTROLS Figure 4 4 Recommended Piping One Boiler with Multiple CH Zones One DHW Tank ...
Страница 25: ...23 WATER PIPING CONTROLS Figure 4 5 Recommended Piping Multiple Boilers with Multiple CH Zones One DHW Tank ...
Страница 36: ...34 ELECTRICAL CONNECTIONS INTERNAL WIRING Figure 7 4 Internal Wiring Schematic for PFC 625 PFC 750 boilers ...
Страница 58: ...56 J LIGHTING OPERATING INSTRUCTIONS Figure 9 1 Lighting Operating Instructions START UP PROCEDURE ...
Страница 76: ...74 REPAIR PARTS 2 9 8 7 2 4 2 1 3 6 6 5 2 10 5 Figure 13 3 Supply Return Piping ...
Страница 78: ...76 REPAIR PARTS 18 16 17 6 14 15 9 4 3 1 8 13 18 7 19 2 10 11 12 5 Figure 13 4 Jacket Assembly ...
Страница 82: ...80 REPAIR PARTS Figure 13 6 Condensate System 1 2 4 7 5 15 15 8 11 3 10 15 6 15 15 12 15 13 15 9 15 14 15 ...
Страница 87: ...85 SERVICE LOG SERVICE LOG Date Serviced By Description of Service Serial Number ...