8
ISSUED: 2012-10-11 SHEET #: 180-9041-2 2012-05-31
Use a stud
fi
nder to locate the edges of the studs and draw a vertical line down the center of
each stud. Place enclosure assembly (
A
) on wall. Level enclosure and mark center of four
mounting holes making sure that the mounting holes are on the stud centerlines. Drill four 1/2"
(13mm) dia. holes through drywall and metal studs.
NOTE
: It may be necessary to drill 5/32"
pilot holes prior to drilling 1/2" holes. Insert togglers (
O
) as shown in
fi
gure 2.4. Insert two 1/4"-
20 x 2.5" phillips screws (
P
), leaving a 1/2" gap between the screw head and the wall, as shown
in
fi
g. 2.5.
Installation to Metal Stud Wall
• Drywall must be 1/2" or thicker, and metal stud must be 24 gauge or heavier.
• Installer must verify that the supporting surface will safely support the combined load of the
equipment and all attached hardware and components (Not Evaluated By UL).
WARNING
• Product must be mounted through drywall
that has a minimum thickness of 1/2" and
into metal studs, 24 gauge or heavier.
• Make sure that togglers are anchored into
the center of the studs as shown in
fi
gure
2.2. The use of an "edge to edge" stud
fi
nder is highly recommended.
• This product is intended for indoor use only.
Use of this product outdoors could lead to
product failure and personal injury.
WARNING
1
fi g. 2.4
fi g. 2.5
1/2"
(13mm)
O
1
2
3
4
5
Pivot end of toggler (
O
).
Push into hole.
Rotate toggler (
O
) clockwise to wedge it against inside walls
of metal stud.
Slide plastic cap forward while pulling back
fi
rmly on ring.
Break off excess.
P
O
Содержание WL-AU-AVWS
Страница 2: ......