PEC Miniverter DC Power Supply
Index
Section and Title
Page
1. UNPACKING AND STORAGE
3
2. INSTALLATION
3
2.1 General
3
2.2 Access to the Inside of the Converter
4
2.2.1 Control Component Access .
4
2.2.2 Power Component Access .
4
3. INSPECTION .
5
3.1 A.C. Input Wiring .
5
3.2 Control Wiring
5
3.3 D.C. Hook Up
6
4. OPERATION
7
4.1 Starting Operation
7
4.2 Control Operation
7
4.2.1 Trigger/Amplifier Board
7
4.2.2 Control Function
7
4.3 Automatic Voltage with Current Limit Operation Adjustment Procedure
9
4.4 Automatic Average Current Density Control with Current Limit Adjustment Procedure
10
4.5 Automatic Current Control with Voltage Limit Adjustment Procedure.
10
4.6 Conversion to Current Mode of Control
11
5. MAINTENANCE
12
6. TROUBLESHOOTING
12
6.1 Method of Checking Diodes Using an Ohmmeter.
13
6.2 Method of Checking Diodes Using a Continuity Tester
13
6.3 Method of Checking Silicon Controlled Rectifier (SCR)
14
Troubleshooting Chart
15
It must be understood that these instructions cannot cover all details or variations on equipment,
nor provide for every possible contingency in connection with installation operation or
maintenance. When the rectifier is installed, it will require little attention.
Should further information be desired or particular problems arise which are not covered herein,
please contact:
Process Electronics Corporation.
100 Brickyard Road
Mount Holly, North Carolina 28120
704-827-9019
- 2 -
Содержание Miniverter
Страница 16: ... 16 ...