5
III
.
INSTALLATION STEPS
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of base-plate (See Fig.
7).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit
(
See Fig. 8).
2. Move the lift aside with a fork lift or hoist, and open the outer packing carefully and
remove aside the top connecting assy. and parts box
(See Fig.
9
).
Shipment Parts list
Outer column
Parts box
Fig. 8
Fig. 9
Chalk Line
3542 mm
Fig. 7
Содержание 211SAC
Страница 1: ...TWO POST LIFT Model 211SAC Original ...
Страница 10: ...8 D Install parts of extension columns See Fig 16 Fig 16 24 26 20 42 25 37 41 ...
Страница 18: ...16 K Raise the carriages up by hand and make them be locked at the same level See Fig 26 Fig 26 ...
Страница 20: ...18 1 2 Connecting cable for high setting See Fig 28 Cable 1 Cable 2 Cable 1 High setting Fig 28 ...
Страница 22: ...20 M Install power unit See Fig 30 Fig 30 ...
Страница 30: ...28 IV EXPLODED VIEW Model 211SAC Fig 43 ...
Страница 36: ...34 4 5 POWER UNIT EXPLODED VIEW 81513003 81513004 220V 50Hz Single Phase 380V 50Hz Three phase Fig 48 ...
Страница 45: ...43 ...
Страница 46: ...44 Date 2021 01 Manual No 72221707 ...