F. Install columns
Lay down two columns on the installation site paralleled, position the power side
column according to the actual installation site. Usually, it is suggested to install
power side column on the front-right side from which vehicles are driven to the lift.
This lift is designed with 2-section columns. Adjustable height according to the
ceiling height and connecting the inner and extension columns.
For 211SAC installation: When the ceiling height is over 4450mm, use high setting.
When the ceiling height is between 4000-4450mm ,use low setting. It is not
allowable to install when the ceiling height is less than 4000mm.
1, High setting installation, the lower hole of extension column is connected with
inner column, see Fig.18
2, Low setting installation, the upper hole of extension column is connected with
inner column, see Fig.19
22
23
21
High setting
Fig.18
Low setting
Fig.19
Содержание 211SAC
Страница 1: ...TWO POST LIFT Model 211SAC Original ...
Страница 10: ...8 D Install parts of extension columns See Fig 16 Fig 16 24 26 20 42 25 37 41 ...
Страница 18: ...16 K Raise the carriages up by hand and make them be locked at the same level See Fig 26 Fig 26 ...
Страница 20: ...18 1 2 Connecting cable for high setting See Fig 28 Cable 1 Cable 2 Cable 1 High setting Fig 28 ...
Страница 22: ...20 M Install power unit See Fig 30 Fig 30 ...
Страница 30: ...28 IV EXPLODED VIEW Model 211SAC Fig 43 ...
Страница 36: ...34 4 5 POWER UNIT EXPLODED VIEW 81513003 81513004 220V 50Hz Single Phase 380V 50Hz Three phase Fig 48 ...
Страница 45: ...43 ...
Страница 46: ...44 Date 2021 01 Manual No 72221707 ...