39
5. Test with load
After finishing the above adjustment, test running the lift with load. Run the lift in
low position for several times first, make sure the lift can rise and lower
synchronously, the safety device can lock and release synchronously. And then test
run the lift to the top completely. If there are anything improper, repeat the above
adjustment.
NOTE: It may be vibrated when lifting at start, lifting it with load for several times,
the air would be bled and the vibration would be disappeared
automatically.
Hydraulic Schematic Diagram
Fig. 53
Содержание 211SAC
Страница 1: ...TWO POST LIFT Model 211SAC Original ...
Страница 10: ...8 D Install parts of extension columns See Fig 16 Fig 16 24 26 20 42 25 37 41 ...
Страница 18: ...16 K Raise the carriages up by hand and make them be locked at the same level See Fig 26 Fig 26 ...
Страница 20: ...18 1 2 Connecting cable for high setting See Fig 28 Cable 1 Cable 2 Cable 1 High setting Fig 28 ...
Страница 22: ...20 M Install power unit See Fig 30 Fig 30 ...
Страница 30: ...28 IV EXPLODED VIEW Model 211SAC Fig 43 ...
Страница 36: ...34 4 5 POWER UNIT EXPLODED VIEW 81513003 81513004 220V 50Hz Single Phase 380V 50Hz Three phase Fig 48 ...
Страница 45: ...43 ...
Страница 46: ...44 Date 2021 01 Manual No 72221707 ...