![PCS PCPGW Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/pcs/pcpgw/pcpgw_user-manual_1516343036.webp)
33 |
P a g e
As the message says, the changes to the schedule don’t take effect until you connect to the
Gateway and save the changes. You can do this after you connect to the Gateway by pressing
the “Schedule Program” button in the “PulseWorx Gateway” ribbon category.
3. After you connect to the Gateway and begin an edit of the schedule, UPStart reads the
schedule from the Gateway and if the schedule in the Gateway doesn’t match the schedule in
the file then this warning appears:
This dialog gives you three options.
-- You can use the schedule in the file and ignore the schedule read from the Gateway.
-- You can use the schedule read from the Gateway and ignore the schedule in the file.
-- You can give up on the edit.
Which to choose depends upon your situation but here is a tip: If you don’t know what is in the
Gateway or you just want to verify what you think is correct, then restart UPStart, connect to
the Gateway, then create a new file – you don’t really have to save it to the disk it just needs to
have no schedule in it – then begin an edit. UPStart reads the schedule from the Gateway and
since the file doesn’t contain a schedule it shows the schedule from the Gateway with no
warning messages.