PB iMPB Скачать руководство пользователя страница 8

Powerbar 

iMPB

website:

  www.powerbarsystems.com  /  www.e-i-eng.com

PowerBar Limited has a policy of continuous development and therefore has the right to supply a product which may diff er in detail from those shown in this publication.

OHSAS 18001:2007

OHS 533652

ISO 9001:2008

FM 12680

ISO 14001:2004

No: EMS 566536

E&I Engineering Corporation

 

USA Manufacturing Location

400 Supreme Industrial Drive
Anderson 

South Carolina

29621
Tel:   

+1 864-375-1757

E&I Engineering LTD     

European Manufacturing Location
Ballyderowen
Burnfoot 
Liff ord
Co.Donegal
Ireland

Tel:

(UK) +44(0)2871353030

(ROI) +353(0)749368106

Powerbar LLC

Middle East Manufacturing Location
N16/N17

Al Ghail Industrial Park

Ras Al Khaimah
PO Box 13229

Tel:

+971(0)72216100

E&I Engineering LTD 

UK Central Offi

  ce

2/8 Victoria Avenue

London 
EC2M4NS

Tel:

+44(0)2032061650

Содержание iMPB

Страница 1: ...iMPB Installation Manual...

Страница 2: ...must be safely secured to the lifting apparatus before lifting Always check that the load does not exceed the safe working load of the lifting apparatus Ensure that equipment is used as per manufactur...

Страница 3: ...ts Care is to be taken not to damage ends of the busbar during installation Powerbar recommends the hanging brackets be mounted no more than 1 5 metres 5 apart Ensure that each section of busbar has a...

Страница 4: ...ar orientation and site conditions may restrict installers from adhering to this methodology In these cases installers must be cautious and ensure the joint pack is installed correctly Ensure all part...

Страница 5: ...ally the first component to be mounted on a run The entire route should initially be inspected for any obstructions before installation The box should be installed at the correct height in accordance...

Страница 6: ...omprise an arrangement of enclosure circuit breaker monitoring device on load isolator and safety interlocks which provide a unique set of safety features for installation and allow the tap off module...

Страница 7: ...ll connected load to the Busbar Trunking via tap offs for example should be isolated prior to energizing the bar The Main Supply switch to the Busbar is to be energized first The Protection Settings s...

Страница 8: ...66536 E I Engineering Corporation USA Manufacturing Location 400 Supreme Industrial Drive Anderson South Carolina 29621 Tel 1 864 375 1757 E I Engineering LTD European Manufacturing Location Ballydero...

Отзывы: