Page 03

Joint Pack

Step 2.

Line up the joint pack with the fi rst length and push on until the 

seperator plate fi ns are touching the end piece of the busbar.  

Insert the fi rst joint pack locking bracket by rotating into place 

and loosly tighteng the nuts.   

Never force the joint or strike it with any object, as this may 

damage the joint or the busbar section.  The joint should be 

inserted by means of constant force i.e. pushing by hand.  

Ensure the joint pack assembly is: 

 free from contaminates

 unblemished

 not damaged 

 correctly aligned

The steps below outline best practice, the Busbar orientation and site conditions may restrict installers from adhering to this 

methodology. In these cases installers must be cautious and ensure the joint pack is installed correctly. Ensure all parts are meggered 

and visually inspected prior to installation.

www.powerbarsystems.com

Step 1.

The joint pack bottom cover and hanging brackets should be 

removed. The top cover comes fi xed to the internal joint pack 

parts. Busbar’s have to be at least 142mm / 5.6” apart for the joint 

to be inserted.  

Min 50mm / 1.96” 

50mm / 1.96” 

100mm / 3.94” 

Step 3.

Line up and insert the second length until the seperator plate fi ns 

are touching the end piece of both busbars. Insert the second 

joint pack fi xing bracket into place. Tighten both joint pack fi xing 

brackets to 10Nm.  

Joint Pack 

Locking Bracket 

Содержание iMPB

Страница 1: ...iMPB Installation Manual...

Страница 2: ...must be safely secured to the lifting apparatus before lifting Always check that the load does not exceed the safe working load of the lifting apparatus Ensure that equipment is used as per manufactur...

Страница 3: ...ts Care is to be taken not to damage ends of the busbar during installation Powerbar recommends the hanging brackets be mounted no more than 1 5 metres 5 apart Ensure that each section of busbar has a...

Страница 4: ...ar orientation and site conditions may restrict installers from adhering to this methodology In these cases installers must be cautious and ensure the joint pack is installed correctly Ensure all part...

Страница 5: ...ally the first component to be mounted on a run The entire route should initially be inspected for any obstructions before installation The box should be installed at the correct height in accordance...

Страница 6: ...omprise an arrangement of enclosure circuit breaker monitoring device on load isolator and safety interlocks which provide a unique set of safety features for installation and allow the tap off module...

Страница 7: ...ll connected load to the Busbar Trunking via tap offs for example should be isolated prior to energizing the bar The Main Supply switch to the Busbar is to be energized first The Protection Settings s...

Страница 8: ...66536 E I Engineering Corporation USA Manufacturing Location 400 Supreme Industrial Drive Anderson South Carolina 29621 Tel 1 864 375 1757 E I Engineering LTD European Manufacturing Location Ballydero...

Отзывы: