5
SmartNode 4830 Getting Started Guide
Installing the V.35 interface cable
.......................................................................................................37
Installing the X.21 interface cable
.......................................................................................................38
Installing the T1/E1 twisted pair cables
..............................................................................................39
Installing the E1 dual coaxial cables
....................................................................................................40
Connecting to external power source
.........................................................................................................41
4
Getting started with the SmartNode
.............................................................................................................. 43
Introduction
..........................................................................................................................................................44
1. Configure IP address
.........................................................................................................................................45
Power connection and default configuration
...................................................................................................45
Connect with the serial interface
.....................................................................................................................45
Login
..............................................................................................................................................................46
Changing the IP address
.................................................................................................................................46
2. Connect the SmartNode to the network
............................................................................................................47
3. Load configuration
............................................................................................................................................47
Bootloader
.............................................................................................................................................................48
Start Bootloader
..............................................................................................................................................48
Start-up with factory configuration
.................................................................................................................49
Load a new application image (SmartWare) via TFTP
....................................................................................49
Load a new application image (SmartWare) via the serial link
.........................................................................51
Additional information
..........................................................................................................................................51
5
LEDs status and monitoring
......................................................................................................................... 52
Status LEDs
...........................................................................................................................................................53
6
Contacting Patton for assistance
................................................................................................................... 56
Introduction
..........................................................................................................................................................57
Contact information
..............................................................................................................................................57
Patton support headquarters in the USA
.........................................................................................................57
Alternate Patton support for Europe, Middle East, and Africa (EMEA)
..........................................................57
Warranty Service and Returned Merchandise Authorizations (RMAs)
...................................................................57
Warranty coverage
..........................................................................................................................................57
Out-of-warranty service
.............................................................................................................................58
Returns for credit
......................................................................................................................................58
Return for credit policy
.............................................................................................................................58
RMA numbers
................................................................................................................................................58
Shipping instructions
................................................................................................................................58
A
Compliance information
.............................................................................................................................. 59
Compliance
...........................................................................................................................................................60
EMC compliance:
...........................................................................................................................................60
Safety compliance:
..........................................................................................................................................60
PSTN regulatory compliance:
.........................................................................................................................60
Radio and TV Interference (FCC Part 15)
............................................................................................................60
FCC Part 68 (ACTA) Statement (FXO ports)
.......................................................................................................61
Industry Canada Notice (FXO ports)
....................................................................................................................61
Содержание SmartNode 4830 Series
Страница 52: ...52 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 53...
Страница 81: ...81 Appendix E SmartNode 4830 Series factory configuration Chapter contents Introduction 82...
Страница 83: ...83 Appendix F Installation checklist Chapter contents Introduction 84...
Страница 85: ...85 Appendix G Accessories Chapter contents Introduction 86...