Introduction
84
SmartNode 4830 Getting Started Guide
F • Installation checklist
Introduction
This appendix lists the tasks for installing a SmartNode 4830 Series Analog VoIP IAD (see
table 22
). Make a
copy of this checklist and mark the entries as you complete each task. For each SmartNode 4830 Series IAD,
include a copy of the completed checklist in your site log.
Table 22. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Содержание SmartNode 4830 Series
Страница 52: ...52 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 53...
Страница 81: ...81 Appendix E SmartNode 4830 Series factory configuration Chapter contents Introduction 82...
Страница 83: ...83 Appendix F Installation checklist Chapter contents Introduction 84...
Страница 85: ...85 Appendix G Accessories Chapter contents Introduction 86...