![background image](http://html.mh-extra.com/html/patton-electronics/smartnode-2292/smartnode-2292_getting-started-manual_763242053.webp)
Introduction
53
Model 2292 & 2294 Series Getting Started Guide
E • Installation checklist
Introduction
This appendix lists the tasks for installing a SmartNode 2292 or 2294 Series extender (see
table 11
) . Make a
copy of this checklist and mark the entries as you complete each task. For each SmartNode 2292 or 2294 Series
extender, include a copy of the completed checklist in your site log.
Table 11. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Содержание SmartNode 2292
Страница 13: ...About this guide Model 2292 2294 Series Getting Started Guide 13 ...
Страница 19: ...19 Chapter 2 Applications overview Chapter contents Typical application 20 Leased line extension 20 ...
Страница 36: ...36 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 37 ...
Страница 52: ...52 Appendix E Installation checklist Chapter contents Introduction 53 ...