![background image](http://html1.mh-extra.com/html/patton-electronics/onsite-07mos10xx-gs/onsite-07mos10xx-gs_getting-started-manual_4091002029.webp)
Tools and Equipment for Installation and Maintenance
29
OnSite Series Getting Started Guide
3 • Installation Overview
Tools and Equipment for Installation and Maintenance
You need the following tools and equipment to install or upgrade the OS-10 system and its components:
•
ESD-preventive cord and wrist strap (when working with modular components or expansion cards)
•
Number 1 or number 2 Phillips screwdriver
•
Mounting brackets (provided); two are required for rack mounting or for wall mounting
•
8 screws (provided) to secure the L mounting brackets to the OS-10 system chassis (four screws for each
bracket)
•
A minimum of four 12-24 x 3/4-inch screws (not provided) to secure the OS-10 system chassis to the rack
•
Suitable screws and wall anchors to install an OS-10 system on a wall
•
Cable ties, if required, for organizing cables
In addition, depending on the type of modules you plan to use, you might need the following equipment to
connect the OS-10 system to an external network:
•
Cables for connection to the fiber-optic and client signal ports (depending on configuration)
•
Ethernet hub or PC with a network interface card for connection to Ethernet LAN ports
•
Console terminal (an ASCII terminal or a PC running terminal emulation software) configured for 9,600
baud, 8 data bits, no parity, and 1 stop bit
OnSite System Installation
Note
Read the information in this section thoroughly and completely
before you attempt to install or remove an OS-10 Series system chas-
sis.
Mounting the Chassis to an EIA/TIA 19-Inch Rack
To install the OS-10 system chassis in an EIA/TIA 19-inch rack, see
Figure 10
and follow these steps:
1.
Install the two L mounting brackets in the orientation shown in
Figure 10
. Insert and fully tighten the
screws to secure the brackets to the chassis (four screws for each bracket).
Note
For this rack configuration, the L mounting bracket holes are flush
with the front panel of the OS-10 system, as shown in Figure 4.
2.
Position the chassis in the rack and align the mounting holes in the L bracket with the mounting holes in
the equipment rack.
Note
The mounting-hole pitch for the 19-inch rack has the following
repetitive pattern: 5/8”- 5/8”-1/2”.
Only trained and qualified personnel should be allowed to install, replace, or
service this equipment.
WARNING
Содержание OnSite 07MOS10xx-GS
Страница 14: ...14 Chapter 1 Product Overview Chapter contents Introduction 15 OnSite Platforms 15...
Страница 18: ...18 Chapter 2 Application Overview Chapter contents OS1052 Application 19 OS1063 Application 21...
Страница 63: ...63 Appendix C Terms and Acronyms Chapter contents Abbreviations 64...