Descriptions of Components

Layout

Electrical Installation for DC Wiring

Installation Steps

Description

1

For DC cable wiring

5

For DC cable wiring

2

The Instruction to provide the information of safety,

Installation and specification.

3

To fix DC wiring box at the bottom of the inverter

4

Object

DC Wiring Box

M12 Hex Nut and Washer

Quick Installation Guide

M5 Hex Nut
M8 Hex Nut

Qty

1

1

5

3 set

3

To fix DC cable from M125HV inverter

1

2

3
4

Component

NO.

DC terminal

28.9 mm gland for DC Wiring

DC switch

Fuse holder

x3

Wall

Step 

1

Step 

2

Step 

3

Wall

Mount the inverter 

Install the DC wiring box

Start DC & AC cabling

Wall

After mounting M125HV, please open the front cover of the DC wiring box before install the wiring box on the inverter.

Pass through the DC cable from M125HV to DC wiring box, Use 4 M5 hex nut to fix the DC wiring box on the
M125HV inverter. (M5 Nut torque: 3.0 N

m)

* Screw torque: 4.4 N

m

Use M8 hex nut to tighten the cable on terminal.

* M8 Nut torque: 14.7 N

m

PV+

PV-

outer

jacket

Conductor cross-section:

Cu: 50 ~ 300 mm

2

Al:  120 ~ 300 mm

2

Below is the procedure for preparing the DC conductors for connection to the DC terminals:
• It is important to choose the proper size for DC cable.
• The cross-sectional area for each DC conductor is 50~300 mm

2

 for Cu.  (120~300 mm

2

 for Al) 

• The maximum width of each terminal lugs should be within 34 mm, the diameter of screw hole should be

  larger than Φ12.5 mm.

• Terminal can use for Cu lug (Tin plated).

5013294300

DC wiring box Installation

DC terminal

After inserting conductor,

torque terminal nut by 45 N

m

Bottom DC entry 

Up to 28.9 mm trade size gland

The thread surface of

the washer must contact

to hex nut.

PV- PV+

Prior to installing conductors on terminal complete the following procedure to make terminals ready for connections.
For each of the DC terminals (PV+ / PV-): 
Tighten/Lose nuts with 19 mm socket. If an electric socket is utilized insure the torque setting is low enough to
NOT OVER-TORQUE the screw. Once nut bottoms out, do not turn it any further. 

Extreme temperature rise at the clamping point

If the contact resistance between the aluminum conductor and clamping point is toohigh, the
clamping point can become very hot and even catch fire in extreme cases.
To ensure a safe and reliable contact, 

always

 perform the following work steps:

     Please select the Al wire size according to rules due to lower conductivity of Al.
     Keep the installation location as free as possible from moisture or corrosive atmospheres.
     Connect the aluminum cables quickly.
     Tighten the clamping screw in the clamping body with the maximum permissible tightening torque.

NOTICE

The figure above illustrates the location of the DC conduit entry and connections to the DC terminal block:
- Ensure the correct conductor is connected to the appropriate terminal.
- After conductor is inserted, use M12 nuts to tight PV+/PV- terminal with a torque of 45 N

m.

DANGER : ELECTRICAL HAZARD!!

- PV array converts sunlight into electric power with high DC voltage and high DC current which can cause

  dangerous electrical shock hazard!

- Use an opaque material to cover the PV array before wiring or cabling.

- Ensure the correct polarities are connected when DC cabling is applied.

DANGER!

- It is forbidden to open both doors at the same time. 

WARNING !

- The risk of electric shock and fire exists because of high DC and AC voltages.

- Only PV modules that are listed with system voltage under 1600V are permitted for use. 

- Inverter warranty void if the DC input voltage exceeds 1600 Vdc.

- Ensure the DC switch is placed in the "OFF" position, and the PV array is disconnected when doing DC cabling.

CAUTION: DC SWITCH ON/OFF !

- In order not to damage the components in the inverter, don’t repeat to change the status of DC Switch quickly,

  the correct operation is waiting for the LED display show "green off and yellow flash" (No DC) or turn on the

  switch after 5 minutes later.

CAUTION: WRONG AC WIRING !

- In order not to damage the components in the inverter, ensure the correct conductor is connected to the

  appropriate DC terminal on the inverter.

- Ensure the DC conductors used are sized to the correct ampacity per NEC or other local code.

<34 mm

<32 mm

Φ12.5 mm

* It is recommended to apply electrical grease before fitting wire conductor into terminal lug for best protection. 

The working temperature of power cable should be at least 90°C.

Conductor Compatible Lug

Cu

Cu(Tin-Plated) 
Cu(Nickel-Plated)
Pure Cu
Stainless steel
Aluminum (Tin-Plated)*

Al

Bi-metal*

DC Terminal (tin-plated)