5 Operations
NURO Control Panel
Once the boiler has been installed in compliance with this manual, it
is necessary to open the front door of the boiler in order to access
the power (on/off) switch located in the upper left hand corner of the
NURO control panels. The
C-1500H & C-2000H
NURO control
panel i
s below:
The
C-2500, C-3000 & C-4000
NURO control panel
is below:
5.1.1 NURO Touch Screen Interface
Once the boiler is switch
ed to the “ON” position, the P-K MACH
®
boiler can be
programmed and operated with the NURO touch screen interface located on
the front door as shown to the right. A clear plastic cover protects the touch
screen which can be opened by pinching the clasp and swinging open to the
left.
Do not use this boiler if any
part has been under water.
Immediately call a qualified
service technician to inspect
the boiler and to replace any
part of the control system
and any gas control which
has been under water.
Failure to do so could result
in electrocution, injury, or
death.
If overheating occurs or the
gas supply fails to shut off,
do not turn off or disconnect
the electrical supply to the
pump. Instead, shut off the
gas supply at a location
external to the boiler.