P-K MACH
®
Gas Fired Boiler
Technical Service 1.877.728.5351
Revised: January 3, 2020
Released: January 3, 2020
Patterson-Kelley 2020
All Rights Reserved.
1004905981 P-K MACH C1500H-C4000 Installation and
Owners Manual (Rev F Jan-2020).docx
Page 57
P-K MACH C1500T & C2000T
4.5.1 Natural Gas Train Location
2” NPT-F
Natural Gas
The boiler must be level within 0.25° in order to function properly. Failure to heed this
warning could result in personal injury or death.