background image

 

ASSEMBLY INSTRUCTIONS (Portable Models) 

 
PH-45-30-P-LP (Liquid Propane)  (for use with 20 lb. & 30 lb. propane cylinders). 
 
Step 1 
Carefully remove all packages from the main packing box.  Remove the base assembly from 
the interior packing box. Gently lift the tank cover off of the base assembly and set aside.    
For shipping purposes, the heater head is bolted in place, inverted, inside the assembly.  
Gently rotate the heater head “counterclockwise” until it is free.  Discard the metal threaded 
“T” that is holding the head in place.  (See Figure 1) 
 
 
 
 
 
 
 
 
 
 
 
  Figure 1                                                      Figure 2                             Figure 3 

 

Step 2 
Remove the 53” hose from it’s packaging and thread the ½” end into the heater head.  A 
suitably approved pipe thread sealant must be used.  Use 2 pipe wrenches to ensure a tight 
and leak free fit.    Remove the 3/8” x 1” bolt from the base of the heater head (Figure 2) and 
set aside so as not to lose it.  Slide the heater head / hose assembly into the 3”  post.  The top 
of the post can be identified by the 3/8” hole being at the top end.  Line up the 3/8” hole in 
the post with the 3/8” hole in the base of the heater head, and replace the previously removed 
3/8” x 1” bolt.  Tighten securely. 
 
Step 3 
Replace the tank cover so that it sits down in place on the weighted base.  Figure 3 
Thread flexible hose down through the opening of the post support assembly and stand the 
post in the assembly.  Raise decorative cover to allow access to the tank storage area. 
 
Step 4 
Secure the regulator to the end of the flexible hose.  Use a pipe wrench and suitably approved 
gas pipe sealant to ensure a tight and leak free connection.  Secure coupling nut on regulator 
into the tank outlet valve on the propane cylinder (cylinder not included). 
 

Step 5 

Secure the reflector dish to top of the heater head assembly using nuts provided 
 
Step 6 
Ensure that the heater is used on a secure and level surface, maintaining the clearances to 
combustibles as outlined on page 2 of this manual.

 

Heater
head

Rotate
c ounter
c loc kwise

Post
Support

53”
hose

3” x 53”
p ost

3/8”
x 1”
bolt

Содержание PH series

Страница 1: ...tentivement les instructions d installation de fonctionnement et d entretien avant de proc der l installation ou l entretien de cet quipement This manual applies to the following Patio Plus models PH...

Страница 2: ...ustment alteration service or maintenance can cause injury property damage or death Read the complete installation manual and all warning labels on the appliance before installation or servicing this...

Страница 3: ...maintained Combustible materials are considered to be wood compressed paper plant fibers or other materials capable of being ignited and burned Such materials shall be considered combustible even thou...

Страница 4: ...atios must be large enough to meet the clearance to combustibles and ventilation requirements as provided for in all applicable codes For very small enclosed patios Patio Plus heaters may not be suita...

Страница 5: ...tach regulator to your L P tank or gas line securely Leave the L P tank outside the cabinet for the testing procedure 3 Open the valve of the L P tank or turn main gas valve to heater ON then leave th...

Страница 6: ...be used on L P gas special precautions should be observed when handling L P cylinders Remember that this is gas and under pressure which must be handled with care Ask your L P gas dealer to show you t...

Страница 7: ...ulator assembly Always store L P cylinders in a well ventilated space If you intend to store the heater indoors disconnect the L P cylinder and store it outside Disconnected cylinders must have a thre...

Страница 8: ...the 3 post The top of the post can be identified by the 3 8 hole being at the top end Line up the 3 8 hole in the post with the 3 8 hole in the base of the heater head and replace the previously remo...

Страница 9: ...de the decorative cover onto the post from the bottom Place the post into the basemount T on the weighted base and slide the decorative cover down over the post retainer Connect gas supply to nipple p...

Страница 10: ...y into post Align the 3 8 hole in the post with the 3 8 threaded hole in the base of the heater head and replace the 3 8 x 1 bolt Secure tightly Step 4 Slide the decorative cover onto the post from th...

Страница 11: ...f the heater head and replace the 3 8 x 1 bolt Secure tightly Step 4 Insert post into the ground support pipe and fasten with hardware provided Connect the gas supply to the nipple protruding from the...

Страница 12: ...sition Ensure that the heater is installed so that it hangs level to the ground and that stress cannot be created on the gas supply piping Step 3 Apply a suitably approved pipe sealant to the nipple p...

Страница 13: ...b will be in an immovable position Wait 90 seconds and the thermocouple will cool and knob will be released to re light pilot To Light Main Burner except Direct Lite After pilot is lit wait 30 seconds...

Страница 14: ...e has no pilot Defective thermopile Defective gas valve Dirty pilot Replace thermopile Replace gas valve Clean pilot Main Burner won t light No 24 Volt power to unit Low gas pressure Blockage in orifi...

Страница 15: ...ds a 3 YEAR warranty from the date of purchase to the original purchaser of this product against manufacturing defects in material and workmanship If this product fails to operate because of a manufac...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...20...

Отзывы: