
Pre-Operation Inspection and Calibration Verification
43
If any of the displays reflects a deviation between displayed and actual values, an authorized
PAT service representative shall be called for repair of the system or re-verification of the
crane’s RCL calibration.
Any structural modifications or changes to the crane shall require re-
verification of the crane’s RCL
calibration.
7. Check that the display of the operating radius of the crane agrees with the actual radius.
8. Check the load display by lifting a load of known weight.
Operation
Upon correct inspection the RCL is operational. The operator shall be thoroughly familiar with all
controls of the RCL before operating the crane. The proper function of the system shall be
checked by lifting a load of known weight and comparing the load to the information displayed
on the RCL.
Rated loads include the weight of the hook block, slings, and auxiliary load handling devices.
Their combined weights shall be subtracted from the listed load capacities as stated on the load
capacity chart to obtain the net load to be lifted.
Содержание DS 350 / 1334 GRAPHIC
Страница 2: ......
Страница 13: ...System Description 1 0 is deactivated...
Страница 51: ...REV DATE NAME DESCRIPTION 09 15 00 CSH HC238 graphic operator s manual created MANUAL REVISIONS...